Date: 16 July 2020 Witness: Rydon Maintenance Limited> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip BLAR00000001_Expert Report - Dr Barbara Lane - Sections 1, 2, 3 & 4_1.pdf(89.54 MB) BLAR00000003_Expert Report - Dr Barbara Lane - Section 8 The external wall materials and construction_0.pdf(27.18 MB) BLAR00000005_Expert Report - Dr Barbara Lane - Section 10 Routes for Vertical and Horizontal fire spread_0.pdf(22.88 MB) BLAR00000006_Expert Report - Dr Barbara Lane - Section 11 Construction of the external walls the provisions made_0.pdf(38.99 MB) BLAR00000008_Expert Report - Dr Barbara Lane - Section 13 Critical times during the fire event_0.pdf(9.48 MB) BLAR00000025_Expert Report - Dr Barbara Lane - Appendix J Smoke extract requirements and provisions_0.pdf(15.57 MB) BLAS0000008_Section 8 Barbara Lane Supplemental Phase 1 Report_0.pdf(26.03 MB) BLAS0000010_Section 10 Barbara Lane Supplemental Phase 1 Report_1.pdf(26.59 MB) BLAS0000011_Section 11 Barbara Lane Supplemental Phase 1 Report_1.pdf(43.33 MB) CEL00000013_Celotex RS5000 guide_3.pdf(6.26 MB) CST00000003_Record of significant findings and action plan -FRA- Grenfell with hand written notes_1.pdf(3.57 MB) CST00000101_Grenfell Tower Significant Findings and Action Plan June 2016._1.pdf(5.4 MB) EXO00001106_Exova Grenfell Tower Outline Fire Safety Strategy dated 07_11_2013_4.pdf(4.32 MB) HAR00003765_Studio E drawing titled reduced window opening leads dated 5 November 2014_0.pdf(497.08 KB) HAR00007785_Purchase Orders for Insulation_1.pdf(201.18 KB) HAR00008581_Harley Plan Entitled _Elevations_ - C1059-201 RevD_2.pdf(3.9 MB) HAR00008583_Harley Plan Entitled _Elevations_ - C1059-202 Rev C_1.pdf(16.42 KB) JTOR00000001_Professor José Torero Phase 1 Expert Report_0.pdf(101.56 MB) KIN00000054_Kingspan document_ BBA Agrement Certificate for Kingspan Kooltherm K15 Rainscreen Insulation Board dated 8 October 2015, including specification and behaviour in relation to fire_0.pdf(5.86 MB) LBYR00000001_Professor Luke Bisby - Expert Report_0.pdf(146.6 MB) RYD00094236_2018.11.23 Rydon's Witness Statement (Company Narrative Statement)_0.pdf(116.54 MB) RYD00094310_Rydon Maintenance Ltd statement (Rule 9 no.2)_1.pdf(6.02 MB) IDX0160_Rydon Company Statement No. 1 (Rydon)_0.pdf(216.41 KB) IDX0249_Rydon Company Statement No. 2 (Rydon)_0.pdf(69.84 KB) LFB00000066__LFB document_ Fire Risk Assessment for Grenfell Tower carried out by Carl Stokes, dated 20 June 2016_.pdf(487.74 KB) MAX00000960_Max Fordham - Grenfell Tower Employer's Requirements for MEP Services_2.pdf(24.77 MB) PSB00000214_PSB Smoke Ventilation Technical Submission - Lobby Smoke Control Systems at Grenfell Tower_1.pdf(12.62 MB) RBK00026860_RBKC Chronology v2_0.pdf(217.02 KB) RYD00001097_Email to Rydon from Appleyards_Artelia at very beginning of tender for main contractor. Provides existing floorplans, drawings, layouts and schedule of works with outline specifica_0.pdf(487.64 KB) RYD00001103_Studio E Outline Specifications_0.pdf(5.68 MB) RYD00001222_Email between Jonathan Rowland (Rydon) and Steve Blake (Rydon) regarding tender brief and initial cost estimates of £8m - £10m._0.pdf(669.4 KB) RYD00001226_Email between Jonathan Rowland (Rydon) and Steve Blake (Rydon) regarding tender brief and initial cost estimates of £8m - £10m._0.pdf(669.64 KB) RYD00001228_Email from Harley to Rydon asking about tender bid, referring to joint work previously on Chalcots and Ferrier, and attaching OJEU contract notice, Abi report referring to zinc cla_0.pdf(442.17 KB) RYD00001240_Email chain between Rydon and Harley concerning bidding for Grenfell Tower Work_0.pdf(608.13 KB) RYD00001398_Email from Mark Harris (Harley) to Steve Blake (Rydon)_0.pdf(426.3 KB) RYD00001407_Email between Peter Arnold (Rydon) and Steve Blake (Rydon) confirming Rydon's PQQ was successful, and they are invited to tender. Rydon's score shows they finished 5th and are give_0.pdf(360.79 KB) RYD00001486_Rydon completed Pre-Qualification Questionnaire draft version._0.pdf(30.6 MB) RYD00001519_Email correspondence involving Rydon and Artelia regarding the invitation to tender for the Grenfell Tower Project, including attaching the Invitation to Tender letter_0.pdf(405.83 KB) RYD00001533_Email from Simon Lawrence (Rydon) to Peter Arnold and Katie Bachellier (Rydon) regarding bidder's conference and attaching press-release regarding tender and power surges._0.pdf(1.86 MB) RYD00001697_Email from Artelia with acknowledgement of tender query log issue 1 (only back page attached), which answered questions from bidder's conference._0.pdf(516.21 KB) RYD00001701_E-mail from Mike Albiston stating that Harley are not _particularly familiar_ with Wicona windows and curtain walling._0.pdf(376.91 KB) RYD00001712_Grenfell Tower Regeneration Project NBS Specification_0.pdf(109.27 MB) RYD00001840_E-mail from Katie Bachellier (Rydon) indicating that Schucco windows do not offer the casement width designed._0.pdf(367.37 KB) RYD00002606_Email from Mike Albiston (Harley) to Katie Bachellier_0.pdf(331.24 KB) RYD00002607_Rydon document entitled 'Grenfell Tower, London - Harley Envelope Contractor' regarding letter from Harley Curtain Wall with their quotation for the envelope package (cladding, cu_0.pdf(2.04 MB) RYD00002649_Harley Document Containing Quotation for Grenfell Tower works dated 29.01.14_0.pdf(2.04 MB) RYD00002884_Enhancements and Improvements to Grenfell Tower - Tender Query Log Issue 13_0.pdf(855.39 KB) RYD00003088_Rydon Document entitled Artelia Contract Sum Analysis regarding costs for works._0.pdf(368.57 KB) RYD00003150_Letter from Artelia to Rydon confirming various tender qualifications are accepted and providing clarifications_0.pdf(2.02 MB) RYD00003279_Email from Jeff Henton (Rydon) to Alan Sharrocks, Simon Lawrence and Zak Maynard (Rydon) informally confirming that TMO have said Rydon's tender price is in first place, and subjec_0.pdf(279.88 KB) RYD00003300_Email from David Gibson (TMO) to Steve Blake_0.pdf(628.71 KB) RYD00003302_Email from Steve Blake to Alan Sharrocks and Others_0.pdf(951.6 KB) RYD00003315_Email from Mark Harris to Steve Blake_0.pdf(575.88 KB) RYD00003316_Harley Document Entitled _Grenfell Tower London Proposed V.E Cost Savings_ showing different cladding options and costs_0.pdf(281.26 KB)