Date: 16 July 2020 Witness: Rydon Maintenance Limited> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00023917_emails ref dispute over proposed change from copper to plastic for pipe work._0.pdf(1.16 MB) RYD00023970_Group email from David Bradbury to arrange a meeting to discuss the AOV design on 24-11-2014_1.pdf(571.08 KB) RYD00024025_Email Discussion between Studio E and RBKC building control concerning fire safety with relevant plans and a memo attached_0.pdf(2.16 MB) RYD00024038_Email Discussion between Studio E and RBKC building control concerning fire safety and windows with drawings relating to windows attached_1.pdf(2.32 MB) RYD00024041_Studio E, drawing entitled Proposed West Elevation, 1279 PL322 Issue 01_0.pdf(2 MB) RYD00024076_Email correspondence between IBI Group and RBKC, copied to Rydon, regarding amendment to the planning application for the windows_0.pdf(1.7 MB) RYD00024171_Email correspondence between IBI Group, RBKC, Rydon, and Studio E regarding amendment to the planning application for the windows_0.pdf(2.16 MB) RYD00024186_E-mail attaching drawings following agreement on new window design_0.pdf(498.95 KB) RYD00024187_Studio E drawing following agreement on new window design_0.pdf(536.42 KB) RYD00024337_Email between Exova, Studio E and Rydon re Initial Appraisal of the Proposed Layout Changes to the Lower Levels of Grenfell Tower, the Fire Strategy and The Means of Escape and Fir_1.pdf(2.73 MB) RYD00024405_Email between Studio E, Ibigroup and Rydon re Grenfell Regeneration Project Additional Planning Information Clarification_0.pdf(444.91 KB) RYD00024409_Studio E drawing entitled “Planning Detail Sheet 2 Base and Crown_, 1279 PL321 00_0.pdf(1.44 MB) RYD00024461_Studio E drawing entitled “Planning Detail Sheet 2 Base and Crown_, 1279 PL321 00_0.pdf(1.44 MB) RYD00024485_External Finishes Schedule_0.pdf(557.42 KB) RYD00024795_Energy Funding_0.pdf(392.37 KB) RYD00024889_Project Change Tracker_0.pdf(2.49 MB) RYD00024899_Minutes of Progress Meeting No. 5 prepared by Artelia_0.pdf(999.8 KB) RYD00025256_Email from Artelia to Rydon and KCTMO attaching Employer's Agent Instruction No. 6 regarding booking the window manufacture slot for Jan 2015_0.pdf(433.26 KB) RYD00025338_Email correspondence between Harley and Rydon regarding the production of the windows_0.pdf(406.79 KB) RYD00025478_Project Change Tracker_0.pdf(1.29 MB) RYD00025628_Rydon - Grenfell Tower Variation to Window Design and Works_0.pdf(454.96 KB) RYD00026451_John Rowan and Partners Site Inspection Report No. 2_0.pdf(1.54 MB) RYD00026513_Minutes of Progress Meeting No. 6 prepared by Artelia_0.pdf(928.96 KB) RYD00026883_Letter from RBKC - Approval of Non Material Amendments - Planning_0.pdf(2.3 MB) RYD00027430_E-mails between Harley and Rydon regarding window size_0.pdf(880.91 KB) RYD00027692_E-mail from Kevin Lamb to Rydon and Studio E attaching drawings of windows to upper 20 floors_0.pdf(453.29 KB) RYD00027697_Harley Plan Entitled _Sections_, C1059-302 Rev D_0.pdf(93.13 KB) RYD00027703_Harley, drawing entitled Elevations, C1059-200, Rev E_0.pdf(59.33 KB) RYD00027976_Email from Neil Crawford to Kevin Lamb (Harley) and others_0.pdf(493.76 KB) RYD00028188_Email from JS Wright to RBKC Building Control, Rydon and Max Fordham with the AOV System at Grenfell Tower and Technical Submission from PSB attached_0.pdf(534.48 KB) RYD00028743_Email between Rydon Studio E and Harley CW with the Specification on the Upper 20 Floors for Grenfell Tower Attached_0.pdf(372.37 KB) RYD00028745_Harley, drawing entitled Specification, C1059-100_0.pdf(59.46 KB) RYD00029308_Artelia Meeting Minutes for Grenfell Tower Progress Meeting No 7 on 20th January 2014_0.pdf(917.46 KB) RYD00030954_Harley, drawing entitled Sections, C1059-325_0.pdf(553.83 KB) RYD00031383_Minutes of Progress meeting No. 7 prepared by Artelia_0.pdf(1.02 MB) RYD00032775_John Rowan and Partners Site Inspection Report No. 4_0.pdf(1.93 MB) RYD00033580_Harley Specification Notes- Grenfell Tower_0.pdf(71.74 KB) RYD00033581_Harley, drawing entitled Elevations, C1059-200, Rev I_0.pdf(1.34 MB) RYD00033583_Harley, drawing entitled Elevations, C1059-202, Rev C_0.pdf(1.06 MB) RYD00033584_Harley, drawing entitled Sections, C1059-301, Rev E_0.pdf(526.37 KB) RYD00033586_Email from Kevin Lamb to Simon Lawrence Re_ firebreaks_0.pdf(427.95 KB) RYD00033589_Harley, drawing entitled Elevations, C1059-200, Rev I_0.pdf(103.67 KB) RYD00033620_Harley, drawing entitled Specification, C1059-100, Rev B_0.pdf(458.59 KB) RYD00033630_Harley, drawing entitled Sections, C1059-325, Rev B_0.pdf(747.6 KB) RYD00034060_Email chain between JS Wright, Rydon and RBKC Building Control re AOV technical submission from specialists PSB. Floor plans of lower floors attached._2.pdf(860.06 KB) RYD00034076_Email between Studio E, Harley CW and Rydon re Grenfell Tower Fire Breaks discussion_0.pdf(505.84 KB) RYD00034134_Email between Studio E, Harley CW and Rydon re Grenfell Tower Party Wall Cladding Fire Breaks discussion_0.pdf(540.39 KB) RYD00034135_Harley, drawing entitled Elevations, C1059-202, Rev C_0.pdf(80.04 KB) RYD00034136_Harley, drawing entitled Elevations, C1059-201, Rev D_0.pdf(93.53 KB) RYD00034137_Harley, drawing entitled _Elevations_, C1059-200 Rev I_0.pdf(101.47 KB)