Date: 16 July 2020 Witness: Rydon Maintenance Limited> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00056564_Harley, drawing entitled Sections C.Wall, C1059-217_0.pdf(574.89 KB) RYD00056565_Harley, drawing entitled Elevations, C1059-218_0.pdf(485.3 KB) RYD00057782_Grenfell Tower Progress Report No. 17 by Rydon_0.pdf(3.14 MB) RYD00057793_John Rowan and Partners Site Inspection Report No. 24_0.pdf(2.36 MB) RYD00057876_Grenfell Tower Progress Report No. 17 by Rydon_0.pdf(3.14 MB) RYD00058366_John Rowan and Partners Site Inspection Report No. 25_0.pdf(2.28 MB) RYD00058863_Snagging Inspection Sheet - West Elevation External_0.pdf(183.1 KB) RYD00059064_Email from Rydon to JRP cc Harley regarding cladding inspection dates and dates for completion of cladding, snags and striking mast climbers._0.pdf(502.69 KB) RYD00059235_External Facade Handover WEST 4 AB_0.pdf(1022.64 KB) RYD00059237_External Facade Handover WEST 2 AB_0.pdf(887.98 KB) RYD00059474_External Facade Handover NORTH 3 CD_0.pdf(912 KB) RYD00059475_External Facade Handover NORTH 7 AB_0.pdf(708.81 KB) RYD00059749_Snagging list for east elevation cladding._0.pdf(12.99 KB) RYD00059755_Snagging Inspection Sheet Pre Plaster_Pre Dec_Pre Handover - Flat 16_0.pdf(492.09 KB) RYD00059905_External Facade Handover EAST 5 BC_0.pdf(580.04 KB) RYD00059916_External Facade Handover EAST 17 BC_0.pdf(1.01 MB) RYD00060321_John Rowan and Partners Site Inspection Report No. 26_0.pdf(2.31 MB) RYD00060791_Email from Harley to Rydon regarding cladding specifications. Warranty covers instances of delamination._0.pdf(364.85 KB) RYD00061416_John Rowan and Partners Site Inspection Report No. 27_0.pdf(2.29 MB) RYD00062023_Excel spreadsheet with progress tracked of snagging and inspection_0.pdf(1.71 MB) RYD00062356_Email thread re Architect walking around site_1.pdf(709.11 KB) RYD00062861_Discussion re how changes made to the lower levels would effect the fire safety strategy._0.pdf(1.45 MB) RYD00063069_Grenfell Tower Valuation No. 16 by Harley_0.pdf(105.99 KB) RYD00063532_Spreadsheet showing progress of works with various aspects ® including surveys, compliance information, tenant handover_0.pdf(5.78 MB) RYD00063566_Grenfell tower minutes of meeting with Building Control_0.pdf(27.24 KB) RYD00063599_Email from David Hughes to John Hoban re site visit_1.pdf(225.49 KB) RYD00063691_Email from Neil Crawford Studio E) to Paul Hanson and John Hoban (both RBKC)_0.pdf(865.11 KB) RYD00063728_JRP Site Inspection Report_0.pdf(2.31 MB) RYD00063791_Email re_ minutes of meeting with Building Control in January 2016_0.pdf(476.01 KB) RYD00063884_Email re_ minutes of meeting with Building Control in January 2016_1.pdf(552.47 KB) RYD00064217_Email chain re snagging flat 65._0.pdf(408.45 KB) RYD00064281_Spreadsheet showing progress of works with various aspects ® including surveys, compliance information, tenant handover_0.pdf(5.76 MB) RYD00064489_Email re_ register of fire stopping works to communal areas_0.pdf(31.85 KB) RYD00064738_Correspondence between Silcock Dawson, JRP, KCTMO, MAx Fordham and Rydon regarding handover of flats at Grenfell Tower_0.pdf(1.26 MB) RYD00064863_Email attached drawings of main entrance canopy_0.pdf(375.58 KB) RYD00065497_John Rowan and Partners Site Inspection Report No. 31_0.pdf(2.18 MB) RYD00065718_Correspondence between Max Fordham, JSWright, Rydon, Artelia Group, Silcock Dawson and JRP regarding absence of sleeving to LTHW and BCWM services through risers_0.pdf(989.6 KB) RYD00066124_Correspondence between Rydon and Harley regarding Entrance Lobby Screen and external cladding at Grenfell Tower_0.pdf(428.23 KB) RYD00066125_Harley specification notes and drawings entitled Elevations (Entrance Canopy) and Sections, C1059-100 Rev 1, C1059-232, C1059-375, C1059-376, C1059-377, C1059-378 with annotations_0.pdf(4.16 MB) RYD00066126_Correspondence between Harley and Rydon concerning the internal atrium screen and referencing cladding for Grenfell Tower with relevant technical documents and plans attached_0.pdf(452.23 KB) RYD00067237_Correspondence between RBKC, Rydon and Harley regarding a query over glazing specification to balustrading_1.pdf(578.77 KB) RYD00067338_Correspondence between RBKC, Studio E, Harley and Rydon concerning the glazing specification for the balustrading and relevant regulatory requirements_1.pdf(1.13 MB) RYD00067663_John Rowan and Partners Site Inspection Report No. 33_0.pdf(1.9 MB) RYD00068226_Harley's Drawing Register for Grenfell Tower_0.pdf(983.65 KB) RYD00069138_PSB Above Ground Commissioning Report_0.pdf(672.52 KB) RYD00070020_Site inspection report_0.pdf(2.17 MB) RYD00070044_Spreadsheet showing progress of works with various aspects ® including surveys, compliance information, tenant handover_0.pdf(7.44 MB) RYD00072110_Rydon document entitled _Testing, Commissioning and Witness Tracker - Residual Snagging Items from M&E Reports - Grenfell Tower_ regarding progress of M&E works_0.pdf(1.57 MB) RYD00072245_Email from John Allen to David Hughes Re_ Building Control Inspection on 24 March 2016_1.pdf(35.53 KB) RYD00074071_Email between Rydon re Communal Smoke Detector and the Extract System Engaging and the Boilers Being Shut Down.pdf(1.44 MB)