RYD00016989_Email from Simon Lawrence to John Hoban Re_ Engagement with Building Control_0.pdf [pdf]
Published on:
RYD00014378_Email regarding Studio E Full Plans Application - Grenfell Tower_1.pdf [pdf]
Published on:
TMO00842292_Exhibit CW_18 - 08 July 2014 - 04 September 2014 Email chain RE_ Grenfell Tower.pdf [pdf]
Published on:
TMO00836785_TMO Document Entitled _Site Inspection Report No 1_ dated 15.10.14 regarding progress, concerns, health and safety, photographs.pdf [pdf]
… 1 Plumbers 2 Carpenters 0 Banksman 1 Labourer 1 Rain cladding 2 Asbestos Removal 3 Concrete drillers 1 Demolition … Preparations both the intemal work is and the external rain cladding system are in progress. Rydon RLO have made … in progress to form FED openings on walkway plus one. Cladding operatives are continuing there surveying of the …
Published on:
PMJ:8 - Peter Johnson Exhibit - Emails sent listing the problems with the LFB command units MET00016970.pdf [pdf]
Published on:
TMO00835977_TMO Document Entitled _Site Inspection Report No 2_ dated 12.12.14 regarding progress, concerns, costs, health and safety, photographs.pdf [pdf]
… on this issue). With the change of design in the exterior cladding and size of the windows, the site manager was not … also confirmed that the manufacturing of the windows and cladding (Harleys), has not commenced yet, which has also … on this issue). With the change of design in the exterior cladding and size of the windows, the site manager was not …
Published on: