Date: 6 June 2022 > View this hearingWitness: Simon Lay> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip PSB00000219_VACON OYJ Test Report dated 5 August 2013.pdf(11.71 KB) PSB00000804_Email from JSW to JSW re Getting the AOV system functional to the occupied area of Grenfell..pdf(149.75 KB) PSB00000220_VACON OYJ Test Report dated 15 June 2015.pdf(18.86 KB) PSB00000882_Outlook calendar entry from Granville Partlow re _commissioning_.pdf(8.28 KB) PSB00000824_408 54NN. Email from Alan Whyte (16.12.15).pd FW_ Grenfell Tower Controls RE concerns regarding costs for commissioning and supply of certification, O&M, embedding drawing of the.pdf(4.75 MB) PSB00000813_Internal email, PSB, from R Midgley to H Mahoney re Getting the AOV system functional to the occupied area of Grenfell.pdf(465.75 KB) PSB00000807_Email from PSB to JSW re Getting the AOV system functional to the occupied area of Grenfell..pdf(318.72 KB) PSB00000806_Email from JSW to PSB re Getting the AOV system functional to the occupied area of Grenfell..pdf(203.54 KB) PSB00000808_Email from JSW to PSB re Getting the AOV system functional to the occupied area of Grenfell..pdf(329.11 KB) PSB00000800_Email from PSB to JSW re basic breakdown of commissioning work activities.pdf(67.17 KB) PSB00000542_Internal emails, PSB from H Mahoney to R Midgley re commissioning costs for AOV.pdf(124.57 KB) PSB00000480_Email from PSB to JSW saying they will halve the quote for the AOV callout.pdf(419.78 KB) PSB00000221_VACON OYJ Test Report dated 15 June 2015.pdf(10.94 KB) PSB00000279_PSB, drawing entitled PSB Smoke Ventilation System Electrical Schematic, PSB E 75015 800 - Rev E.pdf(23.27 MB) PSB00000223_PSB test certificate dated 19 September 2015 regarding control panels above ground - AOV.pdf(256.5 KB) PSB00000222_PSB test certificate dated 4 September 2015 regarding AOV control panels above ground.pdf(12.61 MB) PSB00000630_Email from PSB to Fan Systems re order for 2 inverter panel - different size.pdf(611.16 KB) RYD00061102_Discussion re progress meeting and prioritisation of AOV work.pdf(1.22 MB) RJE00000049_NICEIC Electrical Installation Certificate.pdf(5.02 MB) RYD00003577_Email from Karen Brett at Fire Design Solutions to Frank Smith re Quotation for a Smoke Management System and Associated Detection System for Grenfell Tower..pdf(4.11 MB) RYD00085640_Email chains re. disconnection of smoke detectors in Basement of Grenfell Tower.pdf(1.44 MB) RYD00062328_Email chain between Rydon and JSW regarding meeting 8 December 2015_ AOV update, basement works, works to dry riser, lobby area work, roller shutters and internal flat work. Concer.pdf(2.72 MB) RYD00075882_Discussion re the AOV dial out unit and the witness test for the AOV.pdf(1.13 MB) RYD00076731_Email chain between JS Wright, PSB, Rydon and RBKC Building Control re_ demonstration of smoke ventilation system to building control with relevant documentation attached.pdf(2.22 MB) RBK00013639_Grenfell Tower Service _ Maintenance Sheet..pdf(415.87 KB) RBK00029875_RBKC email chain concerning the 2010 fire at Grenfell and the smoke ventilation system awaiting repairs and not operating properly.pdf(385.99 KB) PSB00001149_Email from PSB to JSW re O&M Email 2 of 4 attaching 4.3.7 Smoke Detector Heads.pdf; 4.3.8 Extract Fans.pdf, 4.3.5 Modular Battery Backup Panel.pdf; 4.3.6 Fireman's Override Switch.pdf(2.82 MB) PSB00001151_Email from PSB to JSW re O&M email 4 of 4 attaching 8.1 E75015-800E Electrical Schematic.pdf, Section 10 Commissioning Reports.pdf, Section 11 Completion Certificate.pdf, Grenfell.pdf(1.04 MB) PSB00001146_Email from PSB to JSW re O&M email 1 of 4 attaching 75019 O&M.doc; 4.3.3 HMI Mimic Override Switch.pdf, 4.3.4 Outstation Modular Control Panel.pdf, 4.3.1 Automatic Lobby Ventilator.pdf(9.4 MB) PSB00001134_Email from JSW to PSB re flow readings Grenfell Tower and dampers.pdf(141.07 KB) PSB00001077_Email from PSB to Fan Systems attaching 14015A PSB One Fan Inverter Panel MODBUS Rev 00.xls.pdf(180.28 KB) PSB00001044_Email from JSW to PSB re Grenfell Tower, London - Commissioning- RE Honeywell Auto Dialler.pdf(426.49 KB) PSB00001026_Email from PSB to JSW re Grenfell Tower, London - Commissioning - attaching Above ground commissioning report..pdf(284.22 KB) PSB00001001_Email from PSB to JSW re technical submission for the smoke control systems @ Grenfell Tower - commissioning report.pdf(1.8 MB) PSB00000953_Email from JSW to PSB re Grenfell Tower - Additional requirements RE 4 No batteries have been mislaid _ lost and need to replace.pdf(217.14 KB) PSB00001150_Email from PSB to JSW re O&M email 3 of 4 attaching 4.3.11 By Pass Dampers.pdf; 4.3.9 Fan Starter Control Panel.pdf; 4.3.10 Pressure Sensor.pdf(490.46 KB) TMO10015312_LFB Deficiency Notice - Grenfell Tower. Nov 16.pdf(120.54 KB) TMO10048225_Email from Sacha Jevans to Simon Throp (TMO) re fire safety at Grenfell Tower following fire on 30.04.10, particularly the smoke control system.pdf(68.8 KB) TMO10048213_Email from Spencer Sutcliff (LFB), to Collette O'Hara (LFB), Janice Wray (TMO) and others re fire safety failings at Grenfell Tower following fire on 30 April 2010.pdf(52.46 KB) TMO10044935_Email from Matt Smith (Max Fordham) to Steve Blake (Rydon) and others re issues with fire alarm system at Grenfell Tower.pdf(368.81 KB) TMO10021318_Lakehouse automated opening vents certificate of inspection..pdf(28.54 KB) SEA00002336_Studio E, drawing of Proposed Floor Plans, 1279 (04) 101 Rev 01, 1279 (04) 102 Rev 01, 1279 (04) 103 Rev 01, 1279 (04) 104 Rev 01, 1279 (04) 105 Rev 01, annotated..pdf(2.46 MB) TMO10014754_KCTMO Email from Claire Williams to Alex Bosman re FRA actions at Grenfell Tower encl. Planned Maintenance Schedule produced by Rydon. Full landlord electrical test not carried out.pdf(708.9 KB) TMO00832548_Email from Peter Maddison to Cllr Blakeman, Edward Daffarn and David Collins regarding Queries from Grenfell Tower Resident Associaiton dated 18 April 2016.pdf(1.24 MB) TMO00831658_Rydon document _Progress Report No 20_ dated Jan_Feb 2016.pdf(2.22 MB) TMO00828539_Lakehouse Allied Protection Inspection Servicing Certificate Fire Alarm System dated 17.01.17..pdf(68.27 KB) RYD00092591_JSWright aftercare to Rydon Aftercare re_ Defect Update. Concern re_ whether alarms being set off would affect the AOV System..pdf(63.34 KB) LAY00000003_2022.05.31 - Unsolicited statement of Simon Lay.pdf(5.41 MB) LAY00000004_Second Errata Sheet for A Report in respect of the smoke control system installed at Grenfell Tower by Simon Francis Lay, dated June 1, 2022.pdf(294.27 KB) MET00040237_BRE Global Client Report - Reconstruction P109378-1002 ISSUE 2..pdf(97.24 MB) RBK00003784_Grenfell Tower readings in fire - ventilation system..pdf(16.54 KB) CST00000236_Document producmed by BMTRADA - fire resistance assessment report for Strebord firedoors prepared for Flaco Panel Products..pdf(5.03 MB) CST00014237_Fire Safety in purpose-built blocks of flats by Local Government Group.pdf(160.33 MB)