Date: 6 June 2022 > View this hearingWitness: Simon Lay> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip LAY00000001_A Report in respect of the smoke control system installed at Grenfell Tower, by Simon Francis Lay, dated 6 August 2021.pdf(134.13 MB) LAY00000002_Errata Sheet for A Report in respect of the smoke control system installed at Grenfell Tower by Simon Francis Lay, dated 6 August 2021 (26 May 2022).pdf(769.1 KB) DCS00000036_Email from Alan Whyte to Kevin Nattrass discussing the mechanism by which the BMS is sent a signal which then activates the safety circuits which shut down the gas valve..pdf(689.8 KB) EXO00001499_Exova Outline Fire Safety Strategy for Grenfell Tower (Issue 2).pdf(4.04 MB) EXO00001129_Studio E, drawing entitled 'Fire Strategy', 1279 (08) 101 Issue 01, Employer's Requirements, annotated..pdf(766.21 KB) EXO00001096_Exova Grenfell Tower Outline Fire Safety Strategy dated 31_10_2012.pdf(5.36 MB) EXO00000971_Exova Existing Fire Safety Strategy Grenfell Tower Regeneration Project Issue D01.pdf(7.9 MB) EXO00000644_Emails between D Campbell (M Fordham), P Booth (Appleyards), Claire Williams (TMO) and others re testing the smoke control system and meetings with Carl Stokes on 23.01.14 and LFB.pdf(1.82 MB) DSM00000001_Chronology of work carried out on Grenfell Tower.pdf(593.46 KB) DSM00000007_Invoice to Parkerr Contracting.pdf(2.51 MB) DCS00000015_Email from Anthony Willmott JS Wright Ltd to Stuart Davis DCS Ltd asking for a DCS engineer to attend the tower regarding the AOVs not opening. There are three attachments to the.pdf(404.93 KB) CST00000093_Grenfell Tower Fire Risk Assessment Oct 2014.pdf(2.87 MB) ART00005407_Rydon- Grenfell Tower Progress Report No 22.pdf(2.22 MB) CST00000796_Studio E, drawing entitled Proposed Residential Plan(W+2), 1279(04)105 Rev 00.pdf(513.35 KB) ART00005575_Email between Max Fordham, Artelia, Rydon and KCTMO re Environmental AOV's on the Entrance Lobby of Grenfell Tower to be Linked to the Smoke Extract System.pdf(2.94 MB) ART00005527_Testing, Commissioning & Witnessing Tracker- Residual Snagging Items for M&E Report- Grenfell Tower.pdf(1.05 MB) CST00000703_Carl Stokes document - Grenfell Tower Fire Risk Assessment -.pdf(220.71 KB) CST00000704_Grenfell Tower Significant Findings and Action Plan..pdf(70.91 KB) CST00000727_Carl Stokes document Grenfell Tower Fire Risk Assessment Nov 2012.pdf(296.25 KB) JSW00004429_Email chain re_ the fitting of AOV Dampers.pdf(3.07 MB) JSW00006475_Document entitled_ 'Guidance on Smoke Control to Common Escape Routes in Apartment Buildings (Flats and Maisonettes) - Revision 2_ October 2015 ' by Smoke Control Association..pdf(6.82 MB) JSW00006271_Email from Alan Whyte of JSW to Jonathan Earl re_ AW provides an update on various construction items as requested. The email attaches a number of documents regarding the AOV syste.pdf(1.05 MB) JSW00006196_Email chain between JS Wright and Rydon re_ list of JSW outstanding works _ issues at Grenfell Tower..pdf(2.12 MB) JSW00006189_Email exchange between David Hughes (Rydon) and Paul Hanson (RBKC) to arrange smoke extract _ ventillation system operational witnessing meeting..pdf(29.66 KB) JSW00006120_Email from Alan Whyte (JS Wright) to Rydon re_update on various issues including fans, PSB commissioning and BMS systems..pdf(1.05 MB) JSW00005676_Basic How to Use Guide for the smoke extract system..pdf(653.46 KB) JSW00004945_Photo of the AOV Panel..pdf(211.72 KB) JSW00002772_Email from dvid Hughes to David Bradbury regarding how ventilation system works.pdf(1.26 MB) JSW00004000_Estates Services monthly checks at Grenfell Tower.pdf(2.73 MB) JSW00002112_Minutes of JSW Progress meeting on 11_2_16.pdf(938.31 KB) JSW00002108_JSW site progress report.pdf(4.04 MB) JSW00001776_Letter from RBKC BC to Rydon re_ recent inspection and outstanding works with annotations in red.pdf(878.4 KB) FPL00000037_Bodycote Assessment Report for the fire performance of Flamebar BW11 Ductwork prepared for Firespray International Ltd.pdf(8.79 MB) FPL00000036_Breglobal report RE_ Assessment into the fire performance of a proprietary design for vertical and horizontal duct systems.pdf(31.23 MB) FPL00000001_Response by Fire Protection Limited to Request for Documents No. 1.pdf(322.89 KB) JSW00002816_Exova warringtonfire, Fire resistance test in accordance with BS EN 1366-2_ 1999 on a multi blade damper assembly. Report No 309850.pdf(11.48 MB) MAX00002130_Letter from Carl Stokes to TMO advising on fire risks during construction.pdf(959.98 KB) PSB00000108_PSB email chain re AOV maintenance issues at GT..pdf(7.91 MB) PSB00000105_PSB email chain re AOV maintenance issues at GT..pdf(1.43 MB) PSB00000003_Email Chain between PSB [Hugh Mahoney and Richard Yeadon] re smoke extract fan product information missing from the technical submission.pdf(276.39 KB) PAR00000044_Technical drawing of AOV system and ducting stated to be FOR APPROVAL.pdf(394.9 KB) MET00018915_James Flin - photograph 34.pdf(260.01 KB) LAK00000505_Allied Protection Inspection and Servicing Certificate (AOV).pdf(31.08 KB) MAX00001471_LFB Deficiency Notice - Grenfell Tower.pdf(52.29 KB) MAX00000836_Max Fordham - Draft Grenfell Tower Refurbishment Mechanical, Electrical and Public Health Stage D.pdf(11.77 MB) LFB00001090_Email from David Hughes at Rydon to various recipients regarding witnessing of operational ventilation system at Grenfell.pdf(369.16 KB) LAK00000494_Allied Protection_ Certificate of Inspection AOV.pdf(23.72 KB) LAK00000362_Lakehouse, inspection certificate re fire alarms, emergency lights and AOV.pdf(126.89 KB) LAK00000358_Lakehouse, inspection certificates for emergency lights (4_8_16 and 15_8_16), fire extinguishers (11_4_16, 24-25_10_16 and 28_10_16) and AOV (24_10_16)( Fire Control Services, six-.pdf(691.62 KB) PSB00000115_Correspondence between PSB (Hugh Mahoney) and J S Wright & Co Ltd (Mr. David Bradbury) dated 9 June 2015 regarding the lobby smoke ventilation system also attaching various quotat.pdf(291.58 KB)