Date: 16 July 2020 Witness: Rydon Maintenance Limited> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00034138_Harley, drawing entitled Specification, C1059-100 Rev A_0.pdf(71.43 KB) RYD00034140_Harley, drawing entitled Sections, C1059-305, Rev C_0.pdf(89.92 KB) RYD00034141_Harley, drawings entitled 'Sections', C1059-301 Rev E_0.pdf(81.69 KB) RYD00034157_Email between Studio E, Harley CW and Rydon re Grenfell Tower Party Wall Cladding Fire Breaks discussion_0.pdf(755.7 KB) RYD00034376_Email between Studio E, Harley CW, Rydon and RBKC re response from Paul Hanson regarding cladding firebreaks (Grenfell Tower)_0.pdf(444.37 KB) RYD00034377_Email from Paul Hanson to Neil Crawford Re_ fire breaks_1.pdf(1.17 MB) RYD00034397_Email Discussion between JS Wright, RBKC Building Control and Rydon relating to a technical submission regarding the AOV and arranging a meeting to discuss it._1.pdf(908.07 KB) RYD00034595_Email between Studio E, RBKC, Rydon and Harley CW re Grenfell Tower Fire Stopping (Compartmentation)_1.pdf(1.46 MB) RYD00035562_Email from Ben Bailey (Harley CW) to Neil Crawford (Studio E) and Simon Lawrence (Rydon) re Grenfell Tower cladding firebreaks_0.pdf(759.31 KB) RYD00035563_Correspondence between Studio E, Harley, Rydon and RBKC regarding Studio E drawings showing the cladding fire breaks, both horizontal and vertical and request from Harley to Rydon_0.pdf(811.52 KB) RYD00036256_Email from JSW to RBKC trying to arrange time to show proposed HIU pressure relief valve connection to existing waste_0.pdf(441.82 KB) RYD00036289_Email re_ requirements for firebeaks within wall buildup between apartments_0.pdf(1.17 MB) RYD00036322_email ref RE_ Grenfell Tower - HIU PRV ad John Hoban visit_0.pdf(602.69 KB) RYD00036826_Harley drawing entitled _Specification_ C1059100 Rev C_0.pdf(467.12 KB) RYD00036827_Harley drawing entitled _Sections_ C1059301 Rev F_0.pdf(602.35 KB) RYD00036828_Harley drawing, entitled _Sections_ C1059304 Rev D_0.pdf(650.68 KB) RYD00036829_Harley drawing entitled _Sections_ C1059305 Rev D_0.pdf(725.84 KB) RYD00036830_Harley drawing entitled _Sections_ C1059325 Rev C_0.pdf(808.81 KB) RYD00036831_Harley drawing, entitled _Sections_ C1059326 Rev B_0.pdf(612.86 KB) RYD00036931_Correspondence between Harley, Rydon and Siderise regarding supply of fire barriers to be installed at Grenfell Tower_0.pdf(794.59 KB) RYD00036987_Correspondence between Siderise, Harley and Studio E regarding fire barriers to be installed at Grenfell Tower_0.pdf(841.6 KB) RYD00037024_Correspondence between Siderise, Harley and Studio E regarding fire barriers to be installed at Grenfell Tower_0.pdf(1.12 MB) RYD00037103_Correspondence between Harley, Studio E and Rydon regarding details for the firebreaks, all upgraded to 120min, at Grenfell Tower_0.pdf(409.27 KB) RYD00037117_Correspondence between Siderise, Harley and Studio E regarding fire barriers to be installed at Grenfell Tower_0.pdf(1.53 MB) RYD00037401_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower_2.pdf(1.85 MB) RYD00037402_Email re. Grenfell Tower Fire Stopping_0.pdf(1.79 MB) RYD00037408_Email re. Grenfell Tower Fire Stopping_0.pdf(2.23 MB) RYD00037409_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower_0.pdf(2.6 MB) RYD00037411_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower_0.pdf(2.22 MB) RYD00037412_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower_0.pdf(2.98 MB) RYD00037413_Harley drawing entitled _Elevations_ C1059202 Rev C_0.pdf(431.73 KB) RYD00037479_Emails between Simon Lawrence and Harley and Rydon regarding Grenfell Tower Fire Stopping_0.pdf(3.25 MB) RYD00037541_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower, also attaching Studio E drawing of Typica_0.pdf(2.08 MB) RYD00037542_Studio E, drawing entitled _Proposed typical bay plans section & elevation_, 1279 (06) 110, Rev 00, Employer's Requirements_0.pdf(3.71 MB) RYD00037622_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower_0.pdf(2.44 MB) RYD00037722_Correspondence between Siderise, Harley, Exova, RBKC, Rydon and Studio E regarding Cavity Barriers and Fire stopping at Grenfell Tower_0.pdf(2.47 MB) RYD00037742_Correspondence between Siderise, Harley, Exova, RBKC, Rydon and Studio E regarding Cavity Barriers and Fire stopping at Grenfell Tower attaching Studio E drawings_1.pdf(2.63 MB) RYD00037743_Studio E, Drawing Entitled _ Detail Sections Sheet 2- Main Entrance_, 1279 (06) 121, Rev 00, Employer's Requirements_0.pdf(1.44 MB) RYD00037744_Studio E, drawing entitled _Details Section Sheet 1_ regarding the Grenfell Tower, 1279 (06) 120, Rev 00, Employer's Requirements_0.pdf(1.49 MB) RYD00037745_Harley, drawing entitled Sections, C1059-325, Rev C_0.pdf(1.13 MB) RYD00037836_Email from John Hoban to Neil Crawford regarding Fire Stopping_3.pdf(3.01 MB) RYD00037839_Harley approved for construction drawing, entitled _Sections_ C1059-325 Rev C - annotated_0.pdf(1.13 MB) RYD00037840_Correspondence between Siderise, Harley, Exova, RBKC, Rydon and Studio E regarding Cavity Barriers and Fire stopping at Grenfell Tower attaching Studio E drawings_0.pdf(3.47 MB) RYD00037844_Correspondence between Siderise, Harley, Exova, RBKC, Studio E regarding a discussion about fire stopping_cladding cavity barriers of the compartment floors to the building also ac_0.pdf(3.35 MB) RYD00037929_Correspondence between Siderise, Harley, Exova, RBKC, Rydon and Studio E regarding Cavity Barriers and Fire stopping at Grenfell Tower_0.pdf(3.88 MB) RYD00038278_Email from Paul Burrows, Artelia to Simon O'Connor, Rydon, discussing responsibility for Health & Safety matters during Grenfell Lift work._0.pdf(2.74 MB) RYD00038871_Email attaching the AOV technical submission_0.pdf(471.79 KB) RYD00038873_Email attaching the AOV technical submission_1.pdf(475.94 KB) RYD00039278_Email from Cenergist to Rydon regarding PAS 2030 and Achilles accreditations in relation to funding request_0.pdf(222.59 KB) RYD00039491_Correspondence between Rydon and Cergist regarding request of certificates_accreditations of contractors in charge of Facade works at Grenfell Tower_0.pdf(139.17 KB)