Date: 16 July 2020 Witness: Rydon Maintenance Limited> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00003319_Email from Katie Bachellier to Steve Blake and others_0.pdf(756.09 KB) RYD00003345_Email from Mike Albiston to Katie Bachellier_0.pdf(803.17 KB) RYD00003348_Email from Steve Blake to David Gibson_1.pdf(762.17 KB) RYD00003355_Email from JSW with spreadsheet showing value engineering. Includes alternative manufacturers for boiler, fan, HIU and flue, plus changing pipework from stainless steel to either c_0.pdf(532.3 KB) RYD00003361_Letter from JS Wright to Rydon enclosing quotation based on tender docs_0.pdf(7.48 MB) RYD00003371_Email in response to JS Wright's offer to cut price by 2.5%_0.pdf(1.77 MB) RYD00003420_Letter from Artelia to Rydon regarding Notice of bidder status. Rydon are informed that they are the preferred bidder for the works and that KCTMO are required to follow standstill_0.pdf(3.43 MB) RYD00003441_Email from Mark Harris to Simon Lawrence_0.pdf(350.33 KB) RYD00003489_Email with attachments on cost cutting cladding_0.pdf(314.61 KB) RYD00003490_Rydon document entitled Grenfell Tower Value Engineering Options_0.pdf(247.45 KB) RYD00003491_Rydon document entitled _Grenfell Tower - Value Engineer Cladding Options__0.pdf(131.18 KB) RYD00003550_Email from Philip Booth to Marc Watterson and Simon Lawrence_0.pdf(20.66 KB) RYD00003627_Email from Rydon to Baily Garner confirming Rydon's appointment, and discussing BREEAM and project funding_0.pdf(543.21 KB) RYD00003682_Email from Artelia to KCTMO, Rydon from meeting with minutes of 1.4.14, pre-contract agreement and contact directory. Minutes include discussions about cost saving on cladding, fix_0.pdf(629.68 KB) RYD00003683_Minutes of the Contractor Introduction Meeting held on 1 April 2014_0.pdf(594.67 KB) RYD00003695_Email from Simon Lawrence to John Milner_0.pdf(1.37 MB) RYD00003701_Email from Marc Watterson to Philip Booth_0.pdf(1.22 MB) RYD00003705_Email from Marc Watterson to Bruce Sounes and Philip Booth re Grenfell discharge of planning conditions_0.pdf(2.07 MB) RYD00003710_Minutes of Contractor Introduction Meeting held on 1 April 2014, prepared by Artelia_0.pdf(593.92 KB) RYD00003781_Email from Darren Adams to Simon Lawrence_0.pdf(1.84 MB) RYD00003791_Emails between Simon Lawrence (Rydon) to Darren Adams (Saving Energy Solutions) re potential ECO funding, EPCs_0.pdf(3.13 MB) RYD00003890_Email from Simon Lawrence to Bruce Sounes_0.pdf(757.44 KB) RYD00003909_Email from Bruce Sounes to Simon Lawrence_0.pdf(1.09 MB) RYD00003913_Email from Mark Harris (Harley) to Simon Lawrence (Rydon) regarding rainscreen cladding samples and material_0.pdf(1.4 MB) RYD00003932_Email from Mark Harris to Simon Lawrence_0.pdf(523.12 KB) RYD00003941_Email from Rydon to Max Fordham asking them to complete a form for grant funding for the upgrade of the communal CHS_0.pdf(519.55 KB) RYD00003951_Email from Simon Lawrence to Mark Harris_0.pdf(582.25 KB) RYD00003953_Email from Simon Lawrence to Bruce Sounes_0.pdf(572.47 KB) RYD00003964_Email from Mark Harris to Simon Lawrence_0.pdf(1.87 MB) RYD00004015_Email from Kai Fabiunke to Mark Harris_0.pdf(780.53 KB) RYD00004027_Email from Simon Lawrence to Mark Harris_0.pdf(749.68 KB) RYD00004033_Email from Simon Lawrence to Kai Fabiunke_0.pdf(1.23 MB) RYD00004122_Email from Mike Albiston to Simon Lawrence_0.pdf(382.4 KB) RYD00004125_Email from Mike Albiston to Simon Lawrence_0.pdf(984.06 KB) RYD00004141_Max Fordham document entitled 'Grenfell Tower Smoke Ventilation Analysis Rev A' dated 6 May 2014_0.pdf(1.45 MB) RYD00004142_Email from Simon Lawrence to Steve Blake which mentions material change from Zinc to ACM._1.pdf(428.44 KB) RYD00004204_Email from Zak Maynard to Stephen Blake regarding cladding savings_0.pdf(243.53 KB) RYD00004221_Email from Claire Williams to Simon Lawrence re planning which discusses change of the panels to aluminium. Also they were happy to omit the louvres from the windows and the extrac_0.pdf(837.87 KB) RYD00004222_Email from Simon Lawrence to Steve Blake re K+C Cladding_0.pdf(619.91 KB) RYD00004242_Email from Bruce Sounes to Simon Lawrence_0.pdf(587.4 KB) RYD00004243_Studio E Drawings for RBKC Planning Meeting_0.pdf(1.47 MB) RYD00004245_Studio E drawing prepared for KCTMO entitled _additional resi_ 1279 SK104 Rev 0_0.pdf(417.34 KB) RYD00004258_Rydon email about promotions and roles_0.pdf(796.87 KB) RYD00004279_Rydon Site Progress Report No. 3482_0.pdf(481.13 KB) RYD00004290_Site progress report re savings needed, identifying cladding and eco funding as majority of sum. Target savings are £900k. Planning input needed on cladding_0.pdf(534.87 KB) RYD00004603_Email attaching minutes of meeting with planners_0.pdf(474.12 KB) RYD00004604_Minutes of Artelia, Rydon, TMO, Studio E meeting with RBKC Planners on 8 May 2014_0.pdf(1.14 MB) RYD00004609_Minutes of Artelia, Rydon, TMO, Studio E Meeting with RBKC planners on 8 May 2014_0.pdf(594.54 KB) RYD00004618_Email from Bruce Sounes to Peter Blythe_0.pdf(1.38 MB) RYD00004621_Email from Peter Blythe to Bruce Sounes_0.pdf(1.93 MB)