Date: 27 October 2020 > View this hearingWitness: Beryl Menzies> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00063884_Email re_ minutes of meeting with Building Control in January 2016_0.pdf(552.47 KB) RYD00067237_Correspondence between RBKC, Rydon and Harley regarding a query over glazing specification to balustrading_0.pdf(578.77 KB) RYD00067338_Correspondence between RBKC, Studio E, Harley and Rydon concerning the glazing specification for the balustrading and relevant regulatory requirements_0.pdf(1.13 MB) RYD00069703_Email from Rydon to RBKC (John Hoban) regarding a site visit to Grenfell Tower.pdf(272.5 KB) RYD00071352_Grenfell Tower H&S File_ O&M Manual Quotation.pdf(1.36 MB) RYD00072245_Email from John Allen to David Hughes Re_ Building Control Inspection on 24 March 2016_0.pdf(35.53 KB) RYD00075492_Email re_ witnessing of smoke extract and ventilation system.pdf(33.46 KB) RYD00075511_Email re_ witnessing of smoke extract and ventilation system.pdf(517.27 KB) RYD00076380_Email from Paul Hanson at RBKC to David Hughes at Rydon re_ booking smoke extract system full operational witnessing..pdf(1.27 MB) RYD00076415_Email discussion between Rydon and RBKC building control concerning documentation related to the AOV.pdf(48.74 KB) RYD00076682_Email discussion of AOV demonstration for building control and testing with relevant smoke control association guidance attached.pdf(1.25 MB) RYD00076725_Email chain between JS Wright, PSB, Rydon and RBKC Building Control re_ demonstration of smoke ventilation system to building control with relevant documentation attached.pdf(2.23 MB) RYD00077614_Email from Rydon to RBKC re Building Control visit to Grenfell Tower.pdf(453.55 KB) RYD00079917_Email attaching an outstanding works letter produced by the RBKC building control manager which references fire doors, windows, the AOV and flooring work.pdf(276.86 KB) RYD00080024_Email chain between PSB, JS Wright, Rydon and RBKC Building Control re the design of the AOV.pdf(1.29 MB) RYD00080025_Email between RBKC and Rydon RE_ 75019 - Grenfell Tower, London - Summary of Results- AOV.pdf(1.23 MB) RYD00080551_Email chain between David Hughes (Rydon) and Steve Butler (All Projects) Concerning items for the refurbishment that need to be completed and attaching a sports floor drawing and D.pdf(713.17 KB) RYD00081016_Email chain between Rydon, JS Wright and RBKC Building Control discussing building control's requirement that environmental AOVs in the lobby linked to the smoke extract system, ot.pdf(2.49 MB) RYD00081502_Email chain between HPS, Rydon, All Group Holdings and JS Wright concerning operations and maintenance work and outstanding information required from JS Wright.pdf(1.17 MB) RYD00081525_Email from Rydon to RBKC re Completion Walkaround.pdf(297.63 KB) RYD00081891_Email re_ photographs of fire door keep shut signs.pdf(18.4 KB) RYD00082020_Email from David Hughes at Rydon to John Hoban at RBKC Building Control concerning a site visit and Rydon's request for a Building Control completion certificate..pdf(20.7 KB) RYD00082205_Email from David Hughes (Rydon) to Paul Hanson and John Hoban (RBKC Building Control) and Steve Blake (Rydon) discussing confirmation of Building Control instruction not to fit smo.pdf(817.17 KB) RYD00082435_Email chain between Rydon and RBKC Building Control concerning a site visit and Rydon's request for a Building Control completion certificate.pdf(38.45 KB) SEA00000046_Email from Max Fordham to RBKC Building Control attaching their interpretation of Part L of building regs and requesting comments_0.pdf(16.68 KB) SEA00000097_Meeting invite_0.pdf(13.73 KB) SEA00000121_Email from Sounes to RBKC attaching fire strategy, strategy drawings, proposal of upgrade to AOV_1.pdf(450.7 KB) SEA00000148_Email sending RBKC Building Control fire strategy and accompanying drawings, response saying information inadequate to show new AOV system not worse than old system_0.pdf(1.29 MB) SEA00000149_Email chain re smoke exhaust LFB submission, clarifying concerns and providing visual schematic, air changes per hour. Embedding drawing from Studio E of natural air ventilation sy.pdf(1.06 MB) SEA00000154_Email sending building control fire strategy and accompanying drawings, query re final exit route, clarification of the same_0.pdf(961.7 KB) SEA00000159_Email sending RBKC Building Control fire strategy, accompanying drawings, clarifications, RBKC response saying information inadequate to show new AOV system not worse than old syst_0.pdf(3.07 MB) SEA00000189_Grenfell Tower Project dry riser email between Rydon and John Hoban RBKC Building Control_1.pdf(531.13 KB) SEA00000215_Email from Crawford to Hoban attaching drawings for GT project, including RBKC mark ups of fire strategy_2.pdf(783.11 KB) SEA00000217_Email to Ashton attaching revised fire strategy plans, comments in response giving approval, extension of smoke extract system serving lift lobbies, fire separation and fire doors.pdf(1.03 MB) SEA00000223_Email from Crawford to Hoban attaching drawings for GT project, including RBKC mark ups of fire strategy, observations from Building Control in response including ventilated lobbie_1.pdf(2.35 MB) SEA00000244_Email from Crawford to Building control attaching fire strategy drawings, queries re fire rating_1.pdf(359.87 KB) SEA00000247_Email chain between JS Wright and Building Control regarding AOV submission, preliminary floor plans, new AOV duct route_0.pdf(898.15 KB) SEA00000252_Correspondence between Studio E, Harley, Rydon and RBKC attaching drawings showing horizontal and vertical fire breaks, discussing fire rating within the wall build up between apar_1.pdf(506.91 KB) SEA00000265_Correspondence between Studio E, Siderise, Harley and RBKC discussing fire rating within the wall build up between apartments_0.pdf(1.99 MB) SEA00000269_Correspondence between Studio E, Siderise, Harley and RBKC discussing fire rating within the wall build up between apartments_0.pdf(2.51 MB) SEA00000340_Correspondence between Studio E, RBKC, KCTMO, Artelia Group, JSWright, Rydon, RJElectrics, Silcockdawson attaching minutes from meeting with building control on 7 Jan 16 with Build_0.pdf(281.57 KB) SEA00000342_Email from Building Control re fire exit sign standards, fire warning system for boxing club, response attaching updated fire strategy drawings_0.pdf(886.76 KB) SEA00000345_Correspondence between KCTMO, RBKC, Arteliaand Studio E attaching minutes from meeting with building control on 7 Jan 16, email response re fire stopping_0.pdf(484.4 KB) SEA00003112_1279 SEA (08) 101 Rev 04 - Fire Strategy.dgn_.pdf(453.97 KB) SEA00009809_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system_0.pdf(1.96 MB) SEA00011395_RE_ Grenfell Tower - Building Control Fees_0.pdf(460.38 KB) SEA00012200_Email Chain Between Crawford, Hoban, Lawrence, Hanson, Ashton, O'Connor, Sounes regarding fire strategy drawings for lower levels, Exova strategy, extraction, riser access_1.pdf(2.88 MB) SEA00012953_Correspondence between RBKC, Studio E and Harley attaching drawings showing fire breaks on party walls and fire rating for walls between apartments_0.pdf(723.42 KB) SEA00012963_Correspondence between RBKC, Studio E and Harley attaching drawings showing fire breaks on party walls and fire rating for walls between apartments_1.pdf(1.01 MB) SEA00013781_Accepted_ site meeting.pdf(9.39 KB)