Date: 8 June 2022 > View this hearingWitness: Dr Ivan Stoianov> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip LFB00004797_Photograph of the instrumentation in the pump bay of a Mercedes Series 2 pump appliance taken during a water demonstration at Paddington Fire Station on 18 July 2018.pdf(578.43 KB) LFB00061037_Email chain between Gayle Ward, Jonathan Reid, Andy Hanson, Dany Cotton and others regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(528.84 KB) LFB00024354_Hydrant Map and Inspection records.pdf(834.01 KB) LFB00061108_Email chain between Janice Wray of the TMO, Robert McTague of the LFB, Maxwell Ahensah-Badu of the RBKC and others concerning Barandon Walk dry riser and hydrant inspection records.pdf(990.01 KB) LFB00061089_Fire Hydrant Test Certificate for Riser 2, Barandon Walk, Lancaster West Estate.pdf(209.86 KB) LFB00061074_Email chain between Janice Wray (TMO), Robert McTague (LFB) , Ben Dewis (LFB) and others RE Barandon Walk dry riser and hydrant inspection records..pdf(952.6 KB) LFB00061055_Email chain between Kush Saini and Andy Hanson regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(1.43 MB) LFB00061054_Email chain involving Gayle Ward, Dany Cotton, Kush Saini, Andy Hanson and others regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(2.19 MB) LFB00061043_Email chain between Kush Saini, Kevin Muller, Andy Hanson, Dany Cotton and others regarding water supply at the Grenfell fire and hydrant inspections in general.pdf(2.05 MB) LFB00061045_Email chain between Kush Saini, Andy Hanson, Gayle Ward, Sandra Ogiste and others regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(1.47 MB) LFB00061031_Email chain between Mark Atkinson, Jonathan Reid, Andy Hanson, Dany Cotton and others regarding water supply at the Grenfell fire and hydrant inspections in general.pdf(2.16 MB) LFB00060663_LFB Letter to Caroline Featherstone from Yvonne Mckenna - Re_ GTI Inquiry - Follow up on Information Request 16.pdf(1.79 MB) LFB00024355_Letter from LFB to the Grenfell Tower Inquiry in response to document and Information Request No. 16 on fire hydrants,.pdf(1.3 MB) LFB00061025_Email chain between Kevin Muller, Jonathan Reid, Andy Hanson, Dany Cotton and others regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(1.52 MB) LFB00060662_LFB Spreadsheet of Hydrants within 500m of Grenfell Tower.xlsx(29.98 KB) LFB00054564_Schedule of Address and LFB Hydrants in North Kensington.xlsx(101.64 KB) LFB00061003_Email chain between Lester Thompson (LFB) and Radoslaw Jozwiak (SSE Enterprise) regarding fire hydrants at White City..pdf(869.18 KB) LFB00061006_Record of actions of operational personnel, Grenfell Tower incident on 14 June 2017_ AC Andy Roe, Incident Commander.pdf(1.61 MB) LFB00061022_Email from Andy Hanson to Dany Cotton and forwarded to others regarding water supply at the Grenfell fire and hydrant inspections in general..pdf(748.67 KB) THA00000021_Call Transcript from TWUL NST to TWUL NMC at 3.09am.pdf(32.23 KB) THA00000029_Call Transcript from TWUL NST to TWUL NMC at 10.24am.pdf(25.93 KB) THA00000028_Call Transcript from TWUL Field Operations Manager to TWUL Despatch at 6.43am.pdf(61.57 KB) THA00000027_Call Transcript from TWUL Despatch to TWUL NST at 6.07am.pdf(99.01 KB) THA00000026_Call Transcript from TWUL NST to TWUL NMC at 4.07am.pdf(75.03 KB) THA00000025_Call Transcript from TWUL NST to TWUL NMC at 4.03am.pdf(39.21 KB) THA00000024_Call Transcript from TWUL NST to TWUL NMC at 3.50am.pdf(52.26 KB) THA00000022_Call Transcript from TWUL NMC to TWUL NST at 3.45am.pdf(47.6 KB) THA00000006_National Guidance Document on the Provision of Water for Fire Fighting by the Local Government Association and Water UK [No.3].pdf(3.99 MB) THA00000012_Call Transcript - LFB to TWUL 24 Hour Team at 1.28am.pdf(83.77 KB) THA00000007_CFOA South East Region Memorandum of Understanding (MOU 2.1) - re_ the installation and repair of fire hydrants and the use of water for extinguishing fires.pdf(2.12 MB) THA00000005_Outline Document provided by TWUL in response to Document Request No.1 - Includes role in the general provision of water to the LFB and its involvement with the fire and_or the fir.pdf(671.84 KB) MET00070433_Exhibit DXN_1.pdf(931.67 KB) MET00039874_NPG_1 - Nicholas Gordon Exhibit - Map.pdf(1.08 MB) MET00018361_Photograph taken by SOCO Mertons on 12th June 2018.pdf(833.99 KB) MET00004795_DSM_1 Key Forensics Reports Exhibits – GT interior and exterior views – Flat 16.pdf(741.66 KB) MET00004596_DSM_1 Key Forensics Reports Exhibits – GT interior and exterior views – APL.pdf(762.97 KB) THA00000008_Information and Data in respect of Water Inputs into the Barrow Hill Zone [before, during and after the Grenfell Tower fire].pdf(4.47 MB) THA00000056_CSV Flow in DM18650_ 01_06_17 to 27_07_17.pdf(3.24 MB) THA00000064_CSV Flow in DM18637_ 01_06_17 - 27_07_17.pdf(3.19 MB) THA00000061_CSV Pressure in DM18650_ 01_06_17 to 27_07_17.pdf(3.26 MB) THA00000059_CSV Flow in DM18649_ 01_06_17 to 27_07_17.pdf(3.19 MB) THA00000058_CSV Flow in DM18632_ 01_06_17 to 27_07_17.pdf(3.03 MB) THA00000057_CSV Flow in DM18630_ 01_06_17 to 27_07_17.pdf(3.09 MB) THA00000035_Call from TWUL NMC to TWUL NST at 2.18am re LFB set up on hydrants.pdf(54.58 KB) THA00000051_TWUL’s Asset Management Design Standard 1.0 - WN05 Water Network Modelling Standard.pdf(20.12 MB) THA00000049_TWUL Modelling Report_ Results for any hydraulic model simulations conducted by Thames Water with the pressure and flow distribution for DMAs.pdf(17.19 MB) THA00000037_Call from TWUL NST to TWUL NMC at 2.44am re DBV and hydrant pressure gauge.pdf(50.15 KB) THA00000036_Call from TWUL NST to TWUL NMC at 2.30am re additional water into the DMA.pdf(47.07 KB) THA00000032_Email from TWUL NMC to TWUL NST at 3_55am re DBV location.pdf(324.34 KB) THA00000030_Senior Network Operator Log.pdf(2.37 MB)