Date: 13 July 2021 Witness: Contractual Documents - A Summary (Version 5) - 13 July 2021> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RYD00027899_Schedule of Information.pdf(9.11 KB) RYD00031326_Rydon Document entitled _Appendix B Standard Terms & Conditions_ by Rydon.pdf(348.82 KB) RYD00027900_Rydon Document entitled _Subcontractor Pre-Contract Interview _ regarding DBS Demolition Services Ltd.pdf(2.74 MB) RYD00031805_Rydon Document entitled _Draft Grenfell Tower Programme with VE Options_.pdf(1.1 MB) RYD00031804_Document entitled _Traffic Plan_ regarding part of Rydon generic document attached_included in subcontractor Letter of Intent Correspondence.pdf(1.43 MB) RYD00031802_Rydon Document entitled _Appendix A - Ascertainment of Fixed Price Sum_ Regarding - SD Plastering Ltd.pdf(318.85 KB) RYD00031331_Rydon Document entitled _Subcontractor Pre-Contract Interview_ completed for Apex Lift.pdf(2.79 MB) RYD00031328_Rydon Document entitled _Rydon Site Protection Policy_ regarding General Guidance®.pdf(549.82 KB) RYD00031327_Rydon Document entitled _The Rydon Way_ setting out Rydon's initial requirements for undertaking work..pdf(944.16 KB) RYD00031330_Rydon Document entitled _Draft - Grenfell Tower Programme with VE Options_ - showing an indication of the construction programme should the onsite start date be revised and removi.pdf(1.79 MB) RYD00031325_Document entitled _Appendix A - Scope of Works & Ascertainment of Lum Sum Price Package - Lift Adaptions_ providing Rates.pdf(246.5 KB) RYD00030984_Schedule of revised costs associated with the addition of two flats, prepared by Rydon.pdf(447.17 KB) RYD00027901_Subcontractor SHE Questionnaire proforma.pdf(2.16 MB) RYD00030521_Email SD Plastering to Rydon - Revised Communal Work Sums.pdf(432.03 KB) RYD00030465_Purchase order sent to GE Door Manufacturing Ltd.pdf(306.93 KB) RYD00030464_Email from Rydon to GE Door Manufacturing re Door Order- Grenfell Tower..pdf(296.57 KB) RYD00027924_Letter from Rydon to DBS Demolition Services regarding Letter of intent sent by Rydon to DBS Demolition Services Ltd which DBS has signed and dated.pdf(1.83 MB) RYD00031324_Letter from Rydon to Apex Lifts regarding Letter of Intent.pdf(1.85 MB) RYD00069209_Email chain concerning and attaching a quote for Health and Safety, Resident and other manuals..pdf(932.29 KB) RYD00041394_Matthew Wigan Associates drawing, entitled _Demolition Plan_ MWA130508 Rev 2.pdf(582.24 KB) RYD00041400_Matthew Wigan drawing entitled _Standard details_ MWA130505 Rev 2.pdf(33.96 KB) RYD00087532_Contract between Rydon and SD Carpentry, showing details of agreed terms and conditions, payments and dates for the completion of work at Grenfell Tower..pdf(1.3 MB) RYD00069359_Matthew Wigan Associates drawing entitled _Tree Pit Details_ MWA341504 Rev 1.pdf(205.22 KB) RYD00070832_Email re health and safety and O&M manual. This email chain refers to lifts at GT being accessible and commencement of document preparation and quotation.pdf(1.15 MB) RYD00087082_Correspondence between JSWright and Rydon regarding Revised Summary of costs for works at Grenfell Tower including those related to the installation of the Extractor fan.pdf(3.02 MB) RYD00040378_Self billing agreement with SD Carpentry.pdf(302.09 KB) RYD00040435_Correspondence between Harley, Rydon and CEP regarding revised window design incorporating previous feedback for Grenfell Tower.pdf(453.72 KB) RYD00034880_Standard building sire measured rates for mid-week dayshift working for Frog Diamond Drilling Limited.pdf(997.43 KB) RYD00036174_Purchase order sent to GE Door Manufacturing.pdf(304.94 KB) RYD00032629_Email from Rydon to SD Plastering Re_ works to riser cupboards for Grenfell Tower.pdf(405.33 KB) RYD00032192_Email attaching plans for walkway +1, Walkway, Mezzanine and Ground floors. Email includes instructions for alterations to be made to the plans..pdf(374.12 KB) RYD00031811_Rydon Document entitled _Subcontractor Pre-Contract Interview Appedix D_ regarding SD Plastering Ltd.pdf(2.67 MB) RYD00031810_Rydon Document entitled _Appendix F, Grenfell Tower- SD Plastering _ regarding - Dry lining Package- Schedule of Information.pdf(8.6 KB) RYD00031809_Rydon Document entitled _Subcontractor Payment Schedule_ regarding Grenfell payment schedule.pdf(13.61 KB) RYD00031808_Rydon Document entitled _Site Protection Policy_ regarding Part of Rydon's generic documentation attached_included in Subcontractor Letter of Intent Correspondence.pdf(1.17 MB) RYD00031807_Rydon Document entitled _The Rydon Way_ regarding Part of Rydon's generic documentation attached_included in Subcontractor Letter of Intent Correspondence.pdf(714.84 KB) RYD00036173_Email attaching the purchase order for cut out locks..pdf(191.08 KB) SDC00000224_SDC Spreadasheet consisting of SDC Carpentry Bill for Doors and Ironmongery at Grenfell Tower - Labour Only Tender Return (including Plant and Fixings).pdf(4.86 MB) SDC00000347_Rydon- Subcontractor- Pre Contract Interview- Appendix D- Grenfell Tower- Carpentry Package.pdf(2.77 MB) SDC00000346_Document Entitled- Grenfell Tower- SD Carpentry Schedule of Information- Appendix F.pdf(9.15 KB) SDC00000345_Rydon- Grenfell Tower- Appendix A- Scope of Works and Ascertainment of Lump Sum Price in the context of the Carpentry Package.pdf(6.54 MB) SDC00000344_Letter from Rydon to SD Carpentry re Confirmation of Order for Grenfell Tower in Accordance with the Terms and Conditions in the Appendices.pdf(1.32 MB) SDC00000343_Rydon- Subcontractor Safety Health and Environmental- Questionnaire and Declaration (Pre Contract Award).pdf(1.17 MB) RYD00089704_Rydon document entitled 'Subcontractor SHE Pre-Qualification Questionnaire' regarding PQQ for Harley Facades Limited..pdf(2.17 MB) SDC00000223_Correspondence between SD Carpentry and Rydon regarding request for quotation about Carpentry Works at Grenfell Tower attaching Tender Return (Labour Return) for the Carpentry Sub-.pdf(815.73 KB) SDA00000004_Email from JRP to Silcock Dawson requesting daily rate and CV for a clerk of works.pdf(8.32 KB) SDA00000002_Email, Silcock Dawson to JRP giving the daily rate and CV for Tony Batty as their sole mechanical clerk of works..pdf(389.71 KB) RYD00094230_Signed collateral deed of appointment - JS Wright, KCTMO and Rydon - dated 25 April 2016.pdf(2.33 MB) RYD00087532_Contract between Rydon and SD Carpentry, showing details of agreed terms and conditions, payments and dates for the completion of work at Grenfell Tower._0.pdf(1.3 MB) RYD00087082_Correspondence between JSWright and Rydon regarding Revised Summary of costs for works at Grenfell Tower including those related to the installation of the Extractor fan_0.pdf(3.02 MB)