Date: 15 September 2021 > View this hearingWitness: Harley Facades LTD> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip HAR00020580_Harley Facades Limited Closing Submissions 041021.pdf(2.31 MB) CEP00048977_Email correspondence between Leadbitter, Alcoa & CEP attaching the outline specification to the refurbishment works of the Grenfell Tower.pdf(511.98 KB) CEP00061698_BRE report prepared for DCLG re_ large scale fire test.pdf(15.3 MB)