Downloads
- MAX00005524_Email exchange between Max Fordham and J S Wright commenting on the Grenfell Tower AOV drawings and request for confirmation that the auto-changeover for the power supply is not in.pdf(3.99 MB)
- MAX00005634_Email Chain Between Rydon, Artelia, TMO, Silcock Dawson, Max Fordham, JRP re additional HIU and AOV works, changes to smoke vent specs, Building Control input into smoke vent syste.pdf(2.51 MB)
- MAX00005741_Email from Max Fordham to KCTMO and others regarding Gas Riser Ventilation at Grenfell Tower, and attaching Studio E, drawing entitled, SK_16 Combined Riser Sketch, J4614 SK_16 Com.pdf(528.02 KB)
- MAX00005745_RE_ Ventilation to gas risers @ Grenfell Tower.pdf(3.71 MB)
- MAX00005751_Email involving Artelia group, KCTMO, Rydon, Max Fordham and others regarding ventilation to gas risers at GT and building control regulations .pdf(4.43 MB)
- MAX00005839_Email discussing smoke control from AOV windows to entrance lobby, boxing club & community rooms.pdf(1.43 MB)
- MAX00005925_Email re concern of CoW about absence of sleeving to LTHW..pdf(1.05 MB)
- MAX00006089_FW_ Grenfell Tower- Building Control Sie inspection 24th March 2016- fire detection in the hub room..pdf(402.33 KB)
- MAX00006346_Email from MF to Radon re Linking Environmental AOV's to smoke extract system @ GrenfellTower.pdf(2.31 MB)
- MAX00006348_Email from Rydon to MF re Linking Environmental AOVs to smoke extract system @ Grenfell Tower_0.pdf(2.59 MB)
- MAX00006355_Email correspondence between Rydon, J S Wright, Silcock Dawson and Max Fordham re_ Linking Environmental AOV's to smoke extract system at Grenfell Tower._0.pdf(2.84 MB)
- MAX00006372_RE_ Linking Environmental AOV's to smoke extract system @ Grenfell Tower_0.pdf(3.1 MB)
- MAX00006400_Email correspondence between Rydon and J S Wright re_ Letter of comfort from RBKC Building Control about linking environmental AOV's to smoke extract system at Grenfell Tower..pdf(4.03 MB)
- MAX00006411_Emails correspondence between Artelia and Rydon re_ (i) outstanding works to achieve practical completion of Grenfell Tower project; (ii) Rydon Completion Meeting Minutes; and (iii.pdf(1.52 MB)
- MAX00017083_Building Control Completion Certificate - Grenfell Tower.pdf(429.81 KB)
- MAX00023246_Email from Studio E to Max Fordham LLP saying they want to site visit to look inside ceilings and cupboards..pdf(939.43 KB)
- MAX00023374_Email from Studio E to Max Fordham LLP attaching podium configuration option and discussing smoke extraction..pdf(507.9 KB)
- MAX00023405_Design team minutes of 24_09_13 including reference to dry riser, smoke extract, asbestos and going over budget..pdf(1.72 MB)
- MAX00023454_Email from Studio to Exovia asking if boxing club can be connected to lift lobby via walkway._0.pdf(1.71 MB)
- MAX00023493_Email from Max Fordham LLP to Exova attaching lobby venting drawings for comment..pdf(1.95 MB)
- MAX00023494_Lobby smoke venting diagram from Studio E annotated..pdf(602.58 KB)
- MAX00023691_Email from Studio E to Exova & Curtins discussing whether savings can be made from rebuilding the narrowest possible staircase..pdf(1.13 MB)
- MAX00023850_Design team minutes from 08_10_13 of 14_10_13..pdf(1.84 MB)
- MAX00023877_Email from Max Fordham LLP to Studio E & Exova attaching lift lobby smoke control proposal and smoke control schematic..pdf(265.2 KB)
- MAX00023878_Smoke control schematic..pdf(565.79 KB)
- MAX00023879_Lift lobby smoke control proposal..pdf(853.24 KB)
- MAX00023904_Exova to Max Fordham LLP & Studio E discussing smoke extract compliance..pdf(986.49 KB)
- MAX00023928_Email from Studio E to TMO attaching latest plans and including notes on the same including fire doors and dry risers..pdf(486.73 KB)
- MAX00023986_16.10.19 [UPDATED] Chronology to the Second Witness Statement of Mark Palmer.pdf(3.98 MB)