Downloads
- SEF00000002_Witness Statement of Graham Neil Smith.pdf(10.77 MB)
- IDX0236_Graham Smith (Simco).pdf(77.38 KB)
- SEF00000003_Email correspondence between Celotex and Simco regarding the installation of a testing rig at BRE's testing facility (drawings of rig attached).pdf(741.52 KB)
- SEF00000004_Simco drawing 1311-CB-02 of test rig for combustion chamber test on system incorporating RS5000 titled _fast frame setout_.pdf(473.95 KB)
- SEF00000005_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _LSF setout_.pdf(426.38 KB)
- SEF00000006_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000, titled _Details_.pdf(452.63 KB)
- SEF00000007_Simco drawing 1311-CB-01 of test rig for combustion chamber test on system incorporating RS5000, titled _Marley Etermit 8mm Natura Setout_.pdf(412.68 KB)
- SEF00000008_Email from Jon Roper (Celotex) to Graham Smith (Simco) regarding amending the test rig drawings as the NHBC require the annotations to be in line with what was tested.pdf(640.89 KB)
- SEF00000019_Emails between Graham Smith (Simco) and Jon Roper (Celotex) regarding timing for BS 8414 test results as Simco looking to use RS5000 on a large project in Manchester.pdf(768.65 KB)
- SEF00000020_Emails between Jon Roper (Celotex) and Graham Smith (Simco) re installation and deconstruction of test rig. Celotex confirm unable to assist on Pendleton Project..pdf(941.08 KB)
- SEF00000021_Email correspondence between Jon Roper (Celotex) and Graham Smith (Simco) regarding the design and installation of the test rig for testing RS5000 and attaching updated drawings.pdf(1.16 MB)
- SEF00000022_Simco drawing 1311-CB-02 of test rig for combustion chamber test on system incorporating RS5000 titled _Fast Frame setout_ (issue for approval).pdf(373.77 KB)
- SEF00000023_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _LSF setout_ (issue for approval).pdf(363.23 KB)
- SEF00000024_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _Details_ (issue for approval).pdf(314.12 KB)
- SEF00000025_Simco drawing 1311-CB-01 of test rig for combustion chamber test on system incorporating RS5000 titled _Marley Eternit 8mm Natura Setout_ (issue for approval).pdf(328.81 KB)
- SEF00000029_Email from Jon Roper (Celotex) to Luke Cresswell (Simco) re RS5000 test specimen for test to be carried out at BRE.pdf(386.23 KB)
- SEF00000030_Marked up (handwritten by Jon Roper (Celotex)) version of Simco drawing 1311-CB-01 for combustion chamber test of RS5000 titled _Marley Eternit 8mm Natura Setout_ (Rev A) - Mark up.pdf(312.51 KB)
- SEF00000031_Emails between Celotex and Simco regarding the design and installation of the test rig for the upcoming BRE fire test - Reynobond was considered for use on test rig.pdf(3.51 MB)
- SEF00000041_Emails between Celotex and Simco regarding the design of the test rig for the upcoming BRE fire test, followed by an internal Simco email.pdf(1.11 MB)
- SEF00000047_Email chain between Celotex and Simco regarding the installation of test rig at BRE - timing and materials required discussed.pdf(156.54 KB)
- SEF00000051_Emails between Celotex, BRE and Simco re test rig drawings requiring amendments to heights and widths (marked up drawings attached).pdf(683.11 KB)
- SEF00000052_Simco drawing 1311-CB-01 of test rig for combustion chamber test on system incorporating RS5000 titled _Marley Eternit 8mm Natura Setout_ with handwritten markup by Phil Clark (BRE_0.pdf(288.48 KB)
- SEF00000053_Email from Jon Roper (Celotex) to Graham Smith (Simco) re commencement of test rig construction at BRE and design amendments required.pdf(440.06 KB)
- SEF00000055_Email chain between Celotex and Simco regarding the installation of test rig at BRE - timing and materials required discussed.pdf(82.19 KB)
- SEF00000056_Emails between Jon Roper (Celotex) to Graham Smith (Simco) regarding amending the test rig drawings as the NHBC require the annotations to be in line with what was tested.pdf(188.14 KB)
- SEF00000058_Emails between Celotex, BRE, and Simco regarding revisions required to test rig drawings and commencing installation at BRE premises.pdf(79.92 KB)
- SEF00000063_Emails between Celotex and Simco re amending drawings to reflect actual test rig as tested, as required by the NHBC (drawings attached).pdf(1.06 MB)
- SEF00000064_Simco drawing 1311-CB-02 of test rig for combustion chamber test on system incorporating RS5000 titled _Fast Frame setout_ (Rev A - Issue for Approval).pdf(468.47 KB)
- SEF00000065_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _LSF setout_ (Rev A - Issue for Approval).pdf(475.19 KB)
- SEF00000066_Simco drawing 1311-CB-04 of test rig for combustion chamber test on system incorporating RS5000 titled _Details_ (Rev B - Issue for Approval).pdf(437.25 KB)
- SEF00000067_Simco drawing 1311-CB-01 of test rig for combustion chamber test on system incorporating RS5000 titled _Marley Eternit 8mm Natura Setout_ (Rev B - Issue for Approval).pdf(527.14 KB)
- SEF00000068_Email from Graham Smith (Simco) to Jon Roper (Celotex) re Simco securing order for 30,000m2 of FR rated phenolic insulation - Celotex testing needs to be completed and issued for C.pdf(404.95 KB)
- SEF00000069_Emails between Celotex and Simco regarding schedule for commencing installation of the test rig for the upcoming BRE fire test.pdf(104.85 KB)
- SEF00000076_Email chain between Celotex and Simco regarding installation of test rig at BRE and Simco's scope of works - Updated drawings attached..pdf(1.1 MB)
- SEF00000077_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _LSF setout_ (Issue for Approval).pdf(3.6 MB)
- SEF00000078_Simco drawing 1311-CB-03 of test rig for combustion chamber test on system incorporating RS5000 titled _Details_ (Rev A - Issue for Approval).pdf(356.38 KB)
- SEF00000079_Simco drawing 1311-CB-01 of test rig for combustion chamber test on system incorporating RS5000 titled _Marley Eternit 8mm Natura Setout_ (Rev A - Issue for Approval).pdf(362.72 KB)
- SEF00000080_Simco drawing 1311-CB-02 of test rig for combustion chamber test on system incorporating RS5000 titled _Fast Frame Setout_ (Issue for Approval).pdf(290.88 KB)
- SEF00000081_Email from Jon Roper (Celotex) to Luke Cresswell (Simco) with test rig photographs.pdf(1.14 MB)
- SEF00000082_Emails between Jon Roper (Celotex) and Graham Smith (Simco) re Simco securing order for 30,000m2 of FR rated phenolic insulation and comment about Celotex testing being on hold due.pdf(917.34 KB)
- SEF00000083_Email chain between Jon Roper (Celotex) and Graham Smith (Simco) - Discussions about limited combustibility and class 0 classification of RS5000, AD B and BR135 testing. Celotex ad.pdf(1.65 MB)
- SEF00000084_Letter from BRE to Celotex confirming Class 0 classification of FR5000 when tested to BS476 part 6 and part 7.pdf(52.65 KB)
- SEF00000085_Celotex FR5000 Datasheet (Issue 1).pdf(934.81 KB)
- SEF00000086_Emails between Luke Cresswell (Simco) and Jon Roper (Celotex) re test rig drawings and further information required..pdf(650.84 KB)
- SEF00000087_Emails between Jon Roper (Celotex) and Luke Cresswell (Simco) re drawings for test rig and timing of testing. May be delay to testing due to NHBC reviewing interpretations of AD B.pdf(609.57 KB)
- SEF00000088_Email from Jon Roper (Celotex) to John Simmons (Simco) re BRE not accepting two cladding panels on one test rig, the use of Eternit Natura panels, fire barriers, and breather membr.pdf(289.16 KB)