Date: 17 November 2020 > View this hearingWitness: Paul Evans> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip CEL00002900_Jon Roper KPI Objective Form 2013 including an objective of accreditation for FR5000 for the use in above 18m applications_0.pdf(26.96 KB) CEL00003006_Celotex Budget 2014 Presentation mentioning the above 18m fire testing and launch.pdf(23.58 MB) CEL00003011_Meeting notification for Above 18m Update.pdf(11.16 KB) CEL00003072_Meeting notification for BRE 135 on 18_02_2014.pdf(9.74 KB) CEL00003116_Appointment notification regarding Above 18m Discussion on 12_05_2014.pdf(100.13 KB) CEL00003120_Above 18m presentation 14-05-14 - insulation re-tested and passed both elements of BS 8414-2 - approved for above 18m use.pdf(554.25 KB) CEL00003125_Email from Paul Evans to Jon Roper re Friday - Above 18m.pdf(436.38 KB) CEL00003197_Emails between Simco and Celotex regarding amendments to the Celotex BR 135 Drawings.pdf(1.44 MB) CEL00003198_Emails between Simco and Celotex attaching the amended Celotex BR 135 Drawing.pdf(1.33 MB) CEL00003215_Emails between Celotex and BRE regarding the revised drawings of the BR135 test.pdf(32.17 KB) CEL00003234_Emails between BRE and Celotex attaching the draft BS 8414 test report.pdf(17.99 KB) CEL00003246_BRE Global Test Report - BS 8414-2 _ 2005 Test on a Celotex RS5000 insulated system with a ventilated Eternit rain screen.pdf(9.05 MB) CEL00003359_Celotex Monthly Report - September 2014..pdf(5.06 MB) CEL00003383_Emails between Celotex, BRE and Total Facades regarding further testing of RS5000 for BS 8414_2..pdf(1.45 MB) CEL00003494_Emails between Kingspan, Squire and Partners, NHBC and internal Celotex emails about Kingspan's approach to fire testing Kooltherm K15 and responding to NHBC's queries.pdf(7.14 MB) CEL00003539_Internal Celotex email RE_ Cellotex Insulation above 18m- RS5000.pdf(2.35 MB) CEL00003587_Internal Celotex email regarding desk top study by Exova extending field of application for RS5000.pdf(1.64 MB) CEL00003640_Internal celotex email regarding meeting with NHBC to discuss RS500 application at above 18m.pdf(39.75 KB) CEL00003682_NHBC Meeting Agenda - May 19th 2015- includes Review of RS5000 as an item.pdf(208.23 KB) CEL00003710_Celotex Monthly Report - May 2015.pdf(3.56 MB) CEL00003868_Internal Celotex email re Mapleton Crescent- RS5000 with Terracotta ventilated facade.pdf(996.48 KB) CEL00008564_Internal Celotex email FW_ Buildings Above 18m in height.pdf(1.18 MB) CEL00008573_Excel spreadsheet entitled Above 18metres (lost opportunities) - August 2012.xls(26.5 KB) CEL00008669_Celotex powerpoint entitled Celotex RS5000 Launch Aug 5th.pdf(7.1 MB) CEL00008766_Internal Celotex email re Cladding Compliance tracker.pdf(572.96 KB) CEL00008767_Excel spreadsheet entitled cladding compliance tracker.pdf(588.93 KB) CEL00008899_Exova report entitled Assessment of the fire performance of external wall systems for use on high rise buildings as featured on the Middlewood Locks project- -Brickwork and Alucobo.pdf(5.57 MB) CEL00009516_Email reminder_ Change note #486.pdf(1.04 MB) CEL00009566_MAG Agenda 140514.doc.pdf(27.71 KB) CEL00009569_Document titled Quality Assurance record Document Action List_Follow up.pdf(111.94 KB) CEL00009649_Emails internal celotex re BR 135 test report comments and drawings..pdf(1.2 MB) CEL00009674_Email internal celotex re launch of RS5000 and how to approach 18m+.pdf(879.11 KB) CEL00009682_Internal Celotex email amending advertisement copy for RS5000.pdf(90.34 KB) CEL00009684_Email internal celotex re advert copy, amendments..pdf(744.39 KB) CEL00009691_Chain of emails between Lizzie Seaton, Paul Evans, Kelly Slociak regarding amending_changing specification guide.pdf(1.55 MB) CEL00009709_Celotex document_ Celotex RS5000 Launch Agenda_0.pdf(230.79 KB) CEL00009873_CELOTEX ORACLE TABLE CHANGE_NOTE + CHANGE_NOTE_LINES for ID 486.xlsx.pdf(50.11 KB) CEL00000670_Celotex email re fire testing.pdf(919.28 KB) CEL00001858_Celotex Above 18m Business Case for the development and launch of AE5000 - suitable for rainscreen cladding applications and fire tested in accordance with BS 8414 for use above 18.pdf(545.53 KB) CEL00002743_Handwritten notes regarding fire tests.pdf(961.22 KB) CEL00002879_Internal Celotex email regarding the interpretation of Approved Document B regarding buildings above 18m and their FR product.pdf(492.52 KB) CEL00003093_Celotex presentation entitled _Above 18m_ including a project update on the BS 8414-2 test conducted on 14 February 2014.pdf(398.66 KB) CEL00009531_Email internal celotex forwarding BRE newsletter, with hyperlink to article about cladding after UAE fire..pdf(1.5 MB) CEL00009889_Change note (486).pdf(423.16 KB) CEL00010272_Celotex Technical Report for Hipchen Thermal Sampling 2009 options for storage of selected data.pdf(52.3 KB) CEL00010498_Celotex intenal correspondence re Hipchen Lambda 22 rolling results.pdf(881.49 KB) CEL00010627_Calendar invitation acceptance for _Above 18m Discussion_ sent from Jon Roper to Paul Evans (Celotex).pdf(10.92 KB) CEL00010629_Celotex presentation on Above 18m.pdf(3.42 MB) CEL00001075_Email Celotex to RMA Architects re use of RS5000 on Limehouse Basin project (and stance of NHBC).pdf(2.16 MB) CEL00001080_Internal Celotex exchange mentioning other NHBC enquiries and attaching timeline of enquiries from Ardmore to Celotex in respect of the Octavius Street project and the use of RS500.pdf(303.05 KB) CEL00001081_Timeline on enquiries from Ardmore to Celotex.pdf(921.61 KB) CEL00001279_Celotex email re Ardmore & RS5000.pdf(1000.89 KB) CEL00002037_Emails between Celotex and Squire and Partners and NHBC, Greenwich Wharf project - regarding NHBC's concerns on use of RS5000 at 18m+ and industry concerns about use of phenolic in.pdf(3.94 MB) CEL00002108_Internal Celotex email re _ RS5000 specifications clause.pdf(761.41 KB) CEL00002193_Letter from Ardmore Group to Celotex regarding the use of RS5000 on the Octavius Street project following it being deemed unacceptable for use by the NHBC due to it being deemed fl.pdf(4.7 MB) CEL00003121_Internal Celotex email from Paul Evans to Jon Roper regarding taking RS Above 18m to market.pdf(1.22 MB) CEL00003335_Internal Celotex email exchange following emails involving Simco and Keepmoat where Keepmoat and Simco request a copy of the RS5000 BRE Test Report.pdf(3.26 MB) CEL00003342_Celotex Budget 2015 Presentation mentioning NHBC _buy-in_ for above 18m applications.pdf(16.8 MB) CEL00003360_Emails between Celotex and Knauf regarding their collaboration and the system tested to BS 8414, comments on Celotex's test system..pdf(1.88 MB) CEL00003445_Emails between Celotex and Durkan Limited regarding NHBC's requirement of BBA accreditation FOR RS5000.pdf(1.38 MB) CEL00003457_Emails between Celotex and Buru Happold regarding the use of RS5000 in a building above 18m.pdf(1.08 MB) CEL00003595_Internal Celotex exchange considering a draft standard response to clients regarding the use of RS5000 above 18m.pdf(2.22 MB) CEL00003600_Internal email to Celotex Technical Department distribution list regarding policy for responding to customer enquiries in relation to the use of RS5000 above 18m.pdf(846.19 KB) CEL00003607_Internal Celotex email RE_ RS5000 for use in rainscreen- fire performance- external cladding panel- Marley.pdf(1.82 MB) CEL00003637_Internal celotex email RE_ Octavia st Celotex Non Compliance Issues- RS5000.pdf(2.63 MB) CEL00003641_Internal celotex email RE_ RS5000 Specification for buildings above 18 metres in height.pdf(1.26 MB) CEL00003660_Internal Celotex email arranging discussion about NHBC's stance on RS5000.pdf(2.82 MB) CEL00003783_Note on NHBC approach to RS5000.pdf(9.1 KB) CEL00003784_Internal Celotex email attaching BRE test report RS8414, August..pdf(510.54 KB) LABC0000312_LABC Registered Details Certificate No_ EW491 for Celotex RS5000 Insulation Board (Rain screen application) includes LABSS (Scotland).pdf(956.89 KB)