Date: 28 October 2020 > View this hearingWitness: Dr Barbara Lane> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip MAX00000960_Max Fordham - Grenfell Tower Employer's Requirements for MEP Services_0.pdf(24.77 MB) MAX00001054_Document including specifications on cladding, windows, fire resisting doors, stairs, general glazing, insulation, fire protection for steelwork, internal fire and safety signage a.pdf(2.66 MB) MAX00001414_RGE Services - Maintenance Report - Smoke Vent System.pdf(2.04 MB) MAX00002511_Grenfell Completion (and Handover) Ver3 - Neil Reed.pdf(32.43 KB) MAX00003112_Email from B Sounes to A McQuatt re_ Refurbishment Works - Budget Cost Estimate nr. 1.pdf(1.56 MB) MAX00003313_Emails within Max Fordham and from Appleyards regarding the draft risk register, requirements for Part L of the regulations and the electricity in flats for the kitchen extract fan.pdf(1.59 MB) MAX00003325_Email from Studio E regarding the ftp location for the Stage C Report.pdf(597.11 KB) MAX00003328_Emails between Studio E and Appleyards regarding the ftp location for the Stage C Report and costs.pdf(1018.2 KB) MAX00003350_Emails between Exova and Studio E regarding RBKC Building Control advice on the refurbishment and fire fighting, smoke ventilation and means of escape detection and containment.pdf(2.15 MB) MAX00003381_Email from Max Fordham to Artelia, Studio E, and KCTMO copied to Taylor Young, Curtins Consulting, Exova and others re Stage D Report - M&E_0.pdf(247.79 KB) MAX00003603_Email from Studio E to various parties providing a link to the completed Stage D report.pdf(538.69 KB) MAX00004665_Email re_ meeting with Building Control, Rydon, J S Wright, Studio E and PSB re_ AOV.pdf(1.13 MB) MAX00006267_RE_ Grenfell - O+M update - 20_5_16.pdf(945.24 KB) MAX00006272_Email correspondence between Artelia, RJ Electrics, KCTMO and Rydon re_ submission of mechanical and electrical O+M manuals for Grenfell Tower and notice of partial handover of the.pdf(2.63 MB) MAX00006278_Email correspondence between Artelia, KCTMO and Rydon re_ submission of mechanical and electrical O+M manuals for Grenfell Tower and notice of partial handover of the building work.pdf(3.19 MB) MAX00006280_Email correspondence between Artelia, KCTMO, and Rydon re_ (i) submission of mechanical and electrical O+M manuals for Grenfell Tower; and (ii) notice of partial handover of the bu.pdf(3.52 MB) MAX00006289_Email from MF to Artelia re Grenfell - Notice for 27_5_16 - Handovers, mechanical and electrical O+Ms..pdf(5.28 MB) MAX00006327_Email discussing completion strategy for outstanding works.pdf(798.41 KB) MAX00006477_ACE Schedule of Services Part G(c ) - Mechanical and elecrical engineering (performance design in buildings) Single Consultant non- lead Consultant..pdf(2.93 MB) MAX00017403_Grenfell Tower Regeneration Project Proposed Floor Plans brochure, illustrating boxing club, walkway, and mezzanine level.pdf(1.42 MB) MAX00023454_Email from Studio to Exovia asking if boxing club can be connected to lift lobby via walkway..pdf(1.71 MB) MAX00023984_ACE Agreement 1_ Design between RBKC and Max Fordham.pdf(3.63 MB) MET00005404_Transcript of decision logging and tactical coordination meeting minutes for Incident Commander AC Andy Roe.pdf(128.35 KB) MET00005405_Record of Actions - AC Andy Roe.pdf(1 MB) MET00019996_BRE Global Test Report - Fire resistance test in accordance with EN1634-1_2014 on a single action, single lead doorset with one vision panel, mounted in a brick and block-wall supp.pdf(4.53 MB) PSB00000209_PSB Smoke Ventilation Technical Submission dated 12 June 2015.pdf(14.41 MB) PSB00000214_PSB Smoke Ventilation Technical Submission - Lobby Smoke Control Systems at Grenfell Tower_0.pdf(12.62 MB) PSB00000224_PSB Above Ground Commissioning Report for AOV dated 28 April 2016.pdf(2.64 MB) PSB00000318_Studio E, drawing entitled Proposed Mezzanine Plan, 1279(04)102 Rev 05.pdf(853.88 KB) PSB00000321_Studio E, drawing entitled Proposed Ground Floor Plan, 1279(04)101 Rev 05, annotated.pdf(814.91 KB) PSB00001235_PSB Smoke Ventilation Technical Submission PSBUK1143-12 rev 1.pdf embedding drawings of PSB Lobby Smoke Control components.pdf(10.73 MB) PSB00001258_PSB UK Completion Certificate (Signed by PB) for the Smoke Ventilation system.pdf(21.08 KB) RBK00000089_Correspondence from Neil Crawford (Associate Studio E) to John Hoban (RBKC Building Control) in cc Paul Hanson (RBKC Building Control) and Simon Lawrence (Rydon) regarding Grenfell.pdf(77.72 KB) RBK00000090_Exova document entitled _Grenfell Tower Fire Safety Strategy_ - Issue 3..pdf(4.27 MB) RBK00000275_RBKC document_ chronology of Grenfell Tower.pdf(106.69 KB) RBK00001413_Email from Paul Hanson_ Grenfell Tower Fire Authority consultation S2_0.pdf(14.65 KB) RBK00001685_Email chain between Studio E and RBKC between Paul Hanson and Neil Crawford, regarding Grenfell fire advice and fire signs and mentioning a cladding inspection._0.pdf(49.66 KB) RBK00001947_Email from John Allen_ National Grid works - advice.pdf(80.46 KB) RBK00002633_Emails between Neil Crawford, Bruce Sounes (Studio E), John Hoban, Paul Hanson (RBKC Building Control), Simon Lawrence (Rydon), Terry Ashton (Exova), Simon O'Connor (Rydon) re buil_0.pdf(120.92 KB) RBK00002965_Correspondence from Bruce Sounes (Studio E) to John Allen, Paul Hanson and in cc Terry Ashton and others regarding Grenfell Tower refurbishment..pdf(16.23 KB) RBK00002966_Grenfell Tower Outline Fire Strategy by Exova (2013).pdf(4.12 MB) RBK00002967_M&E - Smoke Control Proposals - Rev A.pdf(1003.46 KB) RBK00002974_Email from John Hoban to Neil Crawford cc Paul Hanson_ Grenfell Tower, Grenfell Road Regeneration Project Submission 1 Revised 2, attaching plans_0.pdf(166.11 KB) RBK00002978_Email from Paul Hanson to Neil Crawford cc John Hoban_ Grenfell Tower, Grenfell Road Regeneration Project Submission 2, attaching plans with comments_0.pdf(57.46 KB) RBK00002981_Memorandum from Paul Hanson to John Hoban - B1Means of Escape of Observations, Submission 2_0.pdf(663.35 KB) RBK00002985_Exhibit PDH_10 - Pre-application meeting with design team 17_8_2013 and response to information on the mechanical ventilation system from Max Fordham 11_11_2013_1.pdf(86.11 KB) RBK00002987_Exhibit GS_6 - Building Control Completion Certificate.pdf(41.29 KB) RBK00002992_Exova Grenfell Tower Outline Fire Safety Strategy, Issue No 01.pdf(178.77 KB) RBK00002998_Studio E LLP, drawing entitled Proposed Walkway +1 Floor Plan, 1279 RE114 Rev 03, Unannotated..pdf(24.27 KB) RBK00003001_Email from Paul Hanson_ _Grenfell Tower, Grenfell Road, London W11 1TH - Fire Authority Consultation_.pdf(13.11 KB)