Date: 15 September 2021 > View this hearingWitness: Bespoke Design> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip BSD00004014_Phase 2 Module 1 - Written closing submission on behalf of Kevin Lamb T_A Bespoke Design.pdf(4.68 MB) ART00001964_Grenfell Tower Regeneration Project NBS Specification, prepared by Studio E.pdf(110.56 MB) HAR00006567_Email from Ray Bailey to Kevin Lamb, Ben Bailey, Mark Stapley, Rob Maxwel dated 09.03.15 regarding pins on column and spandrel cladding.pdf(12.73 KB) HAR00013587_Internal Harley email concerning drawing revisions with relevant drawings attached.pdf(489.02 KB) HAR00017914_Email from Kevin Lamb to Ben Bailey with attached adjusted cladding panels.pdf(332.46 KB) SEA00002399_Studio E, drawing entitled Nursery Workstation, 1279 (72) 101 Rev 00..pdf(208.98 KB)