Date: 7 July 2020 > View this hearingWitness: Terence Ashton> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip EXO00001621_2018.09.27 - Witness Statement of Terence Ashton (Exova).pdf(237 KB) EXO00001775_2020.04.27 Second Witness Statement of Terence Ashton.pdf(1.29 MB) IDX0058_Terence Ashton (Exova).pdf(66.36 KB) EXO00000378_B Sounes emmail to C Barker cc T Ashton and Studio E re Attending meeting and AOV comments.pdf(460.54 KB) EXO00000385_M Treanor to B Sounes re fee proposal.pdf(246.37 KB) EXO00000388_Email from Cate Cooney to Terry Ashton (Exova) re proposed fire strategy for Grenfell Tower_0.pdf(694.22 KB) EXO00000468_Email M Kiefer to J Lee and T Ashton cc various re drawing issue and fire escape strategies.pdf(370.97 KB) EXO00000474_Email Studio E to Exova re request for fee proposals_0.pdf(454.23 KB) EXO00000518_M Treanor to Adrian Studio E re Issue 1 Fire Strategy_0.pdf(222.57 KB) EXO00000601_Emails between Adrian Jess (Studio E) to Terry Ashton (Exova) re fire strategy_comments on revised mezzanine and walkway level plans for Grenfell.pdf(1.73 MB) EXO00000617_Emails between Claire Williams, Janice Wray (TMO), Carl Stokes, Bruce Sounes (Studio) E, Matt Smith, Duncan Campbell (Max Fordham) and Terry Ashton (Exova) re GT site visit with LF.pdf(3.44 MB) EXO00000627_Emails between C Williams (TMO), Bruce Sounes (Studio E), M Smith (Max Fordham) and T Ashton (Exova) re LFB site visit, smoke control system and tender process.pdf(1.82 MB) EXO00000653_Emails between D Campbell (Max Fordham), P Booth (Appleyards), T Ashton (Exova) cc Studio E, TMO, Max Fordham, Artelia re testing of smoke control system at Grenfell.pdf(1.07 MB) EXO00000708_Email Exova to Studio E re insulation and cavity fire barriers.pdf(1.14 MB) EXO00000715_T Ashton to N Crawford email re Fire Stopping Fire Strategy cavity barrier.pdf(2.34 MB) EXO00000721_Email from RBKC buiiding control to Studio E saying RBKC have insufficient info from fire strategy to consult with LFB. RBKC need to prove the new smoke extract system is as good a.pdf(1.17 MB) EXO00001107_Exova Grenfell Tower Outline Fire Safety Strategy_0.pdf(4.26 MB) EXO00001207_J Watt (Exova) to Adrian and Bruce (Studio E) cc T Ashton (Exova), M Treanor email attaching Design Note Issue 1 Fire Strategy.pdf(220.14 KB) EXO00001315_Email from N Crawford (Studio E), T Ashton (Exova) re cladding, forwarding email from K Lamb (Harley) to S Lawrence (Rydon) cc others re fire breaks, attaching drawings _ plans_0.pdf(568.73 KB) EXO00001328_Internal Exova email to Terry Ashton forwarding email from Margaret Treanor confirming pdf emailed. Chain includes email from Sean McElaney to Terry Ashton approving signature, and.pdf(418.91 KB) EXO00001347_Email T Pearson to T Ashton re External Cladding Fire Risk_0.pdf(17.09 KB) EXO00001406_Emails between Studio E, Exova and Max Fordham re GT fire strategy, including link to revised Exova Outline Fire Safety Strategy Report, embedding drawings of walkway level, and at.pdf(2.31 MB) EXO00001408_Email from Exova to Studio E re Fire Strategy Comments, discussing smoke extract..pdf(2.78 MB) EXO00001624_Exhibit TA19B (Terence Ashton - Exova).pdf(163.8 KB) EXO00001627_TA_9 - Email from Margaret Treanor to Bruce Sounes..pdf(4.51 MB) EXO00001629_2018.09.27 - Index of Exhibits to the Witness Statement of Terence Ashton (Exova).pdf(339.06 KB) EXO00001640_Exhibit TA20 (Terence Ashton - Exova).pdf(2.55 MB) EXO00001643_Exhibit TA19A (Terence Ashton - Exova).pdf(388.96 KB) EXO00001644_TA_12 - Email from Margaret Treanor to Bruce Sounes..pdf(253.55 KB) RBK00018805_Grenfell Tower- Contractor Introduction Meeting- Minutes.pdf(264.19 KB) ART00000026_Grenfell Tower Project – Fire Safety Engineering Services Fee proposal.pdf(9.02 MB) EXO00000220_Email from P Dunkerton (TMO) to B Sounes (Studio E) and T Ashton (Exova) forwarding email from Janice Wray (TMO H&S Manager) re fire at Grenfell Tower on 30.04.10.pdf(1.11 MB) INQ00011258_Understanding the Importance of a Fire Strategy_ The Basis for Design, from Warringtonfire website..pdf(907.96 KB) INQ00011259_Warringtonfire Document entitled Fire safety strategy downloaded from the Warringtonfire website..pdf(608.29 KB) INQ00011261_The Institute of Fire Engineers, Frequently Asked Questions Website Page, _What Is Fire Engineering_.pdf(581.92 KB) MET00065128_Witness statement of Robert Veitch (Exova).pdf(641.79 KB) MET00065659_Exhibit RGV_1 to the witness statement of Robert Veitch dated 12 October 2017.pdf(3.38 MB) TMO10003884_Exova Fee Proposal Initial for fire engineering services.pdf(7.67 MB) ART00000385_Email from Studio E to Appleyards and TMO identifying cost savings on Grenfell Tower Project.pdf(1.59 MB) ART00002255_Artelia Minutes- Grenfell Tower Contractor Introduction Meeting, held 01 April 2014.pdf(2.16 MB) EXO00000390_Email from Exova to Studio E attaching Grenfell ventilation drawings..pdf(347.26 KB) EXO00000543_Email from Alun Dawson (Appleyards) to Terry Ashton (Exova) re Exova fee approval proposal re Grenfell Tower.pdf(803.48 KB) EXO00000693_B Sounes to T Ashton cc Studio E, M Smith (Max F) email re stair placement, embedding drawings of Ground Floor, Mezzanine, Walkway Floor Plans and a Floor Plan of the Boxing Club,.pdf(1.45 MB) EXO00001209_Exova Internal Operating Procedure _Overall Procedure Review_.pdf(2.59 MB) EXO00001371_Minutes of meeting between RBKC Building Control, Studio E and Exova re Fire Strategy.pdf(1.35 MB) EXO00001753_2019.10.16 Witness Statement of Tony Pearson_0.pdf(364.06 KB) MET00065658_Exhibit RGV_2 to the witness statement of Robert Veitch dated 12 October 2017.pdf(303.95 KB) RBK00002985_Exhibit PDH_10 - Pre-application meeting with design team 17_8_2013 and response to information on the mechanical ventilation system from Max Fordham 11_11_2013.pdf(86.11 KB) ART00004926_Email from Claire Williams at TMO to Terry Ashton at Exova regarding changes to grounds floors layout dated 19 October 2015 concerning fire alarm, attaching fire strategy_0.pdf(1.63 MB) ART00006688_Clerk of the Works (COW) Reports Review Meeting Minutes dd 12 January 2016_1.pdf(1.82 MB) ART00006770_Studio E - Notes from Design Team Meeting 8, held on 6 September 2012_1.pdf(1.73 MB) CEL00003541_Email between Celotex and Exoval RE_ tests_1.pdf(78.91 KB) CEL00003547_Outlook appointment for a meeting between Celotex and Exova regarding the RS5000 Field of Application_0.pdf(12.31 KB) CEL00003589_Celotex to Exova email regarding desk top study by Exova extending field of application for RS5000 - setting out common build-ups_0.pdf(1.38 MB) CEL00003615_BCA Technical Guidance Note 18 -Use of combustible cladding materials on residential buildings - 0 - Jun 14_1.pdf(1.05 MB) EXO00000344_M Smith (MaxF) to T Ashton (Exova) cc D Campbell, P Booth email re AOV pressure differential system_1.pdf(17.05 KB) EXO00000618_M Smith to C Williams cc T Ashton, B Sounes, D Campbell email re RBKC lack of records pre-1990_1.pdf(3.52 MB) EXO00000659_M Smith to T Ashton cc B Sounes, D Campbell, Studio E email re AOV and design of fire strategy_1.pdf(1.95 MB) EXO00000709_N Crawford to T Ashton email re cladding drawings from Harley and cavity barriers_1.pdf(1 MB) EXO00000710_Studio E 'Employer's Requirements' drawing showing ground and walkway floor levels dated 26 September 2013 (provided by Exova_0.pdf(3.2 MB) EXO00001430_Email chain between Exova and Studio E regarding insulation and fire barriers_1.pdf(1.86 MB) EXO00001434_Email chain between Studio E and Exova re cladding and fire stopping_1.pdf(2.43 MB) MAX00006084_Email from D Hughes (Rydon) to T Ashton (Exova) cc others, forwarding earlier emails between D Hughes, T Batty (Silcock Dawson), A Bridges (R J Electrics), T Ashton and T Pearson_0.pdf(2.31 MB) MAX00023204_Email from Exova to Studio E re smoke extraction_1.pdf(1.07 MB) RYD00018154_Correspondence between Rydon, Harley and Studio E regarding cavity barriers at Grenfell Tower_0.pdf(1.29 MB) RYD00018155_Celotex information sheet for RS5000 (issue 1_0.pdf(1.1 MB) SEA00013044_Correspondence between Harley, Studio E, Rydon and Exova regarding fire barriers, contrast between cavity barriers and firestops in relation to Grenfell Tower_0.pdf(2.1 MB) BSI00000624 - ExtractD16 - BS 4422-2005- Fire - Vocabulary.pdf(656.62 KB) BSI00001716 - ExtractD16 - PD 7974-0_2002 - Application of fire safety engineering principles to the design of buildings. Guide to design framework and fire safety engineering procedures.pdf(1.36 MB) EXO00000751_Studio E email attaching meeting notes and proposed window details.pdf(483.06 KB) BSI00000018_BS 5588-8_1999 Fire precautions in the design, construction and use of buildings. Part 8_ Code of practice for means of escape for disabled people..pdf(9.2 MB) EXO00001501_Exova Outline Fire Safety Strategy for Grenfell Tower (Issue 3).pdf(4.43 MB)