Date: 21 July 2021 > View this hearingWitness: Roger Howkins> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip APX00008713_Apex Lifts, drawing entitled _General Arrangement - Lift No. H90 and H91_ dated 03_08_2004, No. C5469_001.pdf(481.09 KB) ART00004694_Email from Claire Williams at KCTMO to Neil Reed and Andrew Malcolm at Artelia regarding Simon Lawrence's email from Rydon concerning the operation of lifts during fire and fire pa.pdf(2.13 MB) ART00004696_Internal Artelia email from Neil Reed to Simon Cash regarding Simon Lawrence's email concerning the operation of lifts during fire and fire panel.pdf(2.47 MB) ART00004697_Email from Neil Reed at Artelia to Matt Smith at Max Fordham re Simon Lawrence's email concerning the operation of lifts during fire and fire panel and whether it falls within Max.pdf(2.53 MB) ART00004794_Email from Claire Williams at KCTMO to Simon Lawrence and Steve Blake at Rydon regarding whether lifts are in full working order as fire fighter_evacuation lifts..pdf(2.42 MB) BUT00000001_Letter from Butler & Young Lift Consultants to Grenfell Tower Inquiry re Request for Documents No 1 and responses to questions asked.pdf(1.82 MB) BVL00000001_Exhibit KV_4 - Bureau Veritas' procedure Mech_LIF_Proc_001_ Inspection or Testing Document Electric Traction Lifts (February 2017).pdf(14.17 MB) BVL00000004_Exhibit KV_6 - Bureau Veritas' contract renewal policy provided to the Royal Borough of Kensington and Chelsea with email dated 28 March 2017 accepting terms.pdf(9.13 MB) BVL00000005_Exhibit KV_5 - Bureau Veritas' procedure IP_LIF001_ Thorough Examination on Traction Passenger, Passenger _ Goods, Goods and Service Lifts (July 2014).pdf(455.71 KB) BVL00000008_Exhibit KV_7 - Reports of Thorough Examination of Lifting Equipment dated 12 April 2017 for inspections of lifts H090 and H091 carried out on 10 April 2017.pdf(2.27 MB) BVL00000011_Exhibit IL_2 - Procedure Mech_LIF_Proc_001_ Inspection or Testing Document Electric Traction Lifts (February 2017).pdf(14.16 MB) BVL00000013_Exhibit IL_1 - Procedure IP_LIFOOI_ Thorough Examination of Traction Passenger, Passenger_ Goods Lift, Goods and Service Lifts (July 2014).pdf(985.52 KB) BVL00000018_Bureau Veritas Procedure GEN 001.pdf(1.21 MB) CAL00000001_Calford Seaden report (March 2015) for TMO following inspection of the two lifts in the Tower prior to refurbishment works..pdf(2.65 MB) CAL00000005_E-mails between KCTMO and Calford Seaden as to lift survey on 19.03.2015.pdf(574.89 KB) CAL00000006_E-mail from KCTMO to Calford Seaden forwarding Rydon e-mail as to scope of 2015 lift works.pdf(75.79 KB) CAL00000010_E-mail from KCTMO to Calford Seaden about specifications and lifts inspection report following site visit.pdf(1.02 MB) CAL00000030_E-mail KCTMO to Calford Seaden about scope of lift refurbishment.pdf(1.03 MB) CAL00000042_E-mail KCTMO to Calford Seaden as to scope of inspection report on lifts.pdf(803.84 KB) CAL00000045_E-mail KCTMO to Calford Seaden as to purpose of 19th March site visit.pdf(1.07 MB) CST00000196_Grenfell fire risk assessment actions log..pdf(6.61 MB) CST00000471_Carl Stokes document entitled Grenfell Tower Fire Risk Assessment Nov 2012.pdf(283.93 KB) CST00000712_Grenfell Tower Fire Risk Assessment Oct 2014.pdf(2.85 MB) CST00000719_Grenfell Tower Fire Risk Assessment June 2016.pdf(1.99 MB) CST00001188_TMO Fire Safety Strategy Draft. Includes definition of high risk category etc for high rises and list of firefighting lifts including Grenfell..pdf(803.96 KB) CST00001734_Record of Significant Findings and Action Plan- Grenfell Tower 2014.pdf(3.61 MB) CST00001810_TMO document entitled _TMO Fire Safety Strategy_..pdf(10.59 MB) CST00001858_Emails between C Williams, J Wray (TMO) and C Stokes re need for FRA review of Grenfell Tower owing to relocation of main entrance.pdf(263.92 KB) CST00002038_Grenfell Tower – Instructions for operation of Lifts Fire Control.pdf(269.56 KB) CST00002206_Carl Stokes Record of Significant Findings and Action for Grenfell Tower.pdf(4.31 MB) GHP00000002_Email correspondence between KCTO & Gerald Honey as to quotation for a lift report & scope of work needed.pdf(125.26 KB) GHP00000003_Invoice from Gerlad Honey to KCTMO for a report on lift installation and a full condition survey.pdf(67.2 KB) GHP00000004_Lift report listing areas of snagging and concern following installation of landing entrances; includes references to issues with landing push indicators, rollers, doors, clutch.pdf(153.41 KB) GHP00000007_Email correspondence between KCTMO and Gerald Honey in relation to instructions as to a lift report; includes information as to the background of the lift works.pdf(260.1 KB) LFB00000850_Internal LFB email from Daniel Hallissey to North Kensington distribution list forwarding message from Alastair Jackson entitled _FW_ Grenfell tower access_ regarding familiarisati.pdf(517.17 KB) LFB00000951_Email from Claire Williams (TMO) to Daniel Hallissey (LFB) forwarded to North Kensington LFB regarding Grenfell Tower lift works completed on 21_05_2015..pdf(406.66 KB) LFB00010934_LFB _Notifiable Fire Report_ regarding an incident at Flat 64, Grenfell Tower on 30 April 2010. Gives narrative detail of the fire..pdf(401.51 KB) LFB00040080_Letter from Steve Turek (LFB) to Housing Departments, ALMOs, and Social Housing Landlords regarding operation and checking of smoke ventilation systems, and the maintenance of fire.pdf(1.21 MB) LFB00040516_Email between David Green, Nicholas Coombe, and Richard Nye (LFB) regarding smoke ventilation systems and maintenance of lifts, 29 March 2016.pdf(1.01 MB) LFB00083895_Exhibit MA_38 - Email from Tom George_ ‘Immediate action to check Express Drop Release Keys’.pdf(636.8 KB) MET00012525_BRE Global Client Report P109378-1012 – Interim - Dated 9th March 2018.pdf(40.19 MB) MET00018469_WSP building management system final report.pdf(9.68 MB) MET00019973_WSP report on lifts produced for MPS.pdf(23.72 MB) MET00035731_KCTMO's formal Notice of award of contract to PDERS for Lift Preventative Planned Maintenance and Repair Contract.pdf(646.12 KB) MET00035769_Service Visit Report - Lifts H090 & H091 at Grenfell Tower.pdf(191.31 KB) MET00035852_Bureau Veritas Report of Thorough Examination of Lifting Equipment for H090 - Grenfell Tower.pdf(452.29 KB) MET00035853_Bureau Veritas Report of Thorough Examination of Lifting Equipment for H091 - Grenfell Tower.pdf(429.88 KB) MET00035907_Bureau Veritas Report of Thorough Examination of Lifting Equipment for H091 - Grenfell Tower.pdf(471.86 KB) MET00036488_Bureau Veritas Report of Thorough Examination of Lifting Equipment for H090 - Grenfell Tower.pdf(466.5 KB) MET00036489_Bureau Veritas Report of Thorough Examination of Lifting Equipment for H091 - Grenfell Tower.pdf(440.14 KB)