Downloads
- CEL00010043_Witness Statement of Robert Gary Warren (Celotex).pdf(1 MB)
- IDX0046_Robert Warren No. 1 (Celotex).pdf(63.77 KB)
- CEL00000627_Email IFC to Celotex re meeting dates.pdf(334.92 KB)
- CEL00001087_Celotex email re NHBC position on above 18m_0.pdf(259.99 KB)
- CEL00001047_NHBC and Celotex email_ follow up after meeting regarding 18m+ and full fill insulation_0.pdf(1.75 MB)
- CEL00001043_Celotex email to NHBC_ follow up after meeting RS5000 and full-fill insulation_0.pdf(975.74 KB)
- CEL00000836_Internal Celotex meeting reminder re_ BS 8414 fire test in Watford on 14_02_2014._0.pdf(12.77 KB)
- CEL00000743_Email Celotex to NHBC seeking advice on requirements_0.pdf(271.11 KB)
- CEL00000635_Celotex & IFC meeting agenda.pdf(195.06 KB)
- CEL00000648_Internal Celotex email following request from IFC for BRE test report 252177 (in respect of GA3080 tested in accordance with BS 476 Part 21_ 1986 on a timber stud load-bearing wal.pdf(1.26 MB)
- CEL00000538_Diagram of tested configuration RS5000 (attached to email CEL00000537) and internal email following the Grenfell Tower Fire looking at the Performance Criteria and what was used on.pdf(471.86 KB)
- CEL00000537_Celotex internal email attaching a drawing of system incorporating RS 5000 as tested to BS 8414, with comments as to possible cladding build-up on Grenfell Tower.pdf(437.32 KB)
- CEL00000417_Rainscreen cladding specification guide RS5000_1.pdf(5.89 MB)
- CEL00000415_Celotex guide_ 'Rainscreen Cladding Compliance Guide' on compliance with Aproved Document B2_1.pdf(1.55 MB)
- CEL00000412_Celotex RS5000 Product Datasheet_2.pdf(1.15 MB)
- CEL00000411_Celotex RS5000 datasheet_2.pdf(1.11 MB)
- CEL00000409_Celotex RS5000 data sheet_3.pdf(1.2 MB)
- CEL00000011_Report Title_ Classification Report in accordance with requirements of BR135_ 2013 Annex B®Issue Number_ 2®Report Number_ 295255_2.pdf(1.39 MB)
- CEL00001195_Minutes of meeting IFC, Sotech and Celotex regarding fire testing_3.pdf(20.13 KB)
- CEL00001300_Celotex email re NHBC Technical Guidance Note including RS5000.pdf(749.62 KB)
- CEL00001230_Email regarding training presentation on RS5000 launch_0.pdf(756.14 KB)
- CEL00001229_Celotex presentation on RS5000 launch_0.pdf(5.95 MB)
- CEL00001228_Email regarding presentation of RS5000_1.pdf(18.63 KB)
- CEL00001196_Celotex presentation on above 18m testing programme_3.pdf(2.23 MB)
- CEL00001089_Email Celotex to NHBC regarding meeting to discuss development of RS5000.pdf(1.19 MB)
- CEL00001194_Internal Celotex email attaching summary of meeting with Sotech_1.pdf(207.86 KB)
- CEL00001125_Response from Celotex to NHBC email re RS5000 reports, including further feedback from Exova_0.pdf(632.28 KB)
- CEL00001122_Internal Celotex email following exchanges with the NHBC regarding Celotex’s RS5000 test report_0.pdf(3.35 MB)
- CEL00001110_NHBC email to Celotex confirming receipt of reports_2.pdf(1.2 MB)
- CEL00001106_NHBC Meeting Agenda.pdf(213.92 KB)
- CEL00001105_Celotex email to NHBC re letter 21 April setting up meeting.pdf(1.61 MB)
- CEL00001088_NHBC letter with guidance on compliance with fire safety standards_0.pdf(1.03 MB)
- CEL00002834_Harley, drawing entitled Cladding panels, C1059-WS-153 Rev A, C1059-WS-92 Rev A, C1059-WS-117, C1059-WS-116, C1059-WS-115, C1059-WS-114, C1059-WS-113, C1059-WS-112, C1059-WS-111, C.pdf(684.31 KB)
- CEL00002833_Harley, drawing entitled CGL Cladding, C1059-WS-67 Rev A, Cladding Panels, C1059-WS-66 Rev B, C1059-WS-66 Rev B, CGL Cladding C1059-WS-59, C1059-WS-60.pdf(81.16 KB)
- CEL00002832_Harley, drawings entitled Elevations Entrance Canopy, C1059-100 Rev 1, Elevations, C1059-219 Rev G, Specification, C1059-100 Rev H, Sections C. Wall, C1059-341 Rev A.pdf(213.01 KB)
- CEL00002831_Bundle of Harley drawings entitled _Elevations - End Bay.Mezzanine Level RH West Elevation_ C1059 215 D; _Elevations - End Bay - Level Walkway RH Elevation_, C1059 213 Rev C, annot.pdf(160.98 KB)
- CEL00002830_Harley drawings entitled _Sections - Cladding Junction Walkway +1_ C1059 329, and _Elevations - Typical Bay - Level Walkway +1 North & South Elevation_, C1059 206 Rev A, annotated.pdf(88.28 KB)
- CEL00002829_Harley, drawings entitled Sections, C1059-305 Rev D, annotated, Elevations, C1059-204 Rev C, annotated, Sections, C1059-236 Rev B, annotated.pdf(183.86 KB)
- CEL00002828_Harley, drawings entitled Sections and marked Fire Breaks, C1059-301 Rev F.pdf(68.81 KB)
- CEL00002743_Handwritten notes regarding fire tests_0.pdf(960.62 KB)
- CEL00002662_Handwritten notes from various meetings regarding a range of topics including notes under a heading of “NHBC”_0.pdf(461.95 KB)
- CEL00002607_Handwritten notes regarding FR Polyol change from BASF IS503 to IS501 in Aug 2012_0.pdf(554.41 KB)
- CEL00001850_Internal Celotex email re_ Above 18m Scoping (CTC Input).pdf(1.14 MB)
- CEL00001430_Internal Celotex email containing screenshot of Salesforce entry dated 20 May 2015.pdf(678.29 KB)
- CEL00001429_Salesforce print out of Grenfell Tower record on day of fire.pdf(697.46 KB)
- CEL00001406_Email chain between Martin Stearne (SIG) and Rob Warren re NHBC's approach to RS5000 use above 18m_1.pdf(1.49 MB)
- CEL00002691_Handwritten notes regarding fire testing_0.pdf(880.81 KB)
- CEL00002958_Internal Celotex email attaching the 3rd edition of BR 135_0.pdf(173.13 KB)
- CEL00003640_Internal celotex email regarding meeting with NHBC to discuss RS500 application at above 18m_0.pdf(37.52 KB)
- CEL00003604_Internal Celotex email re standard reply for queries about RS5000 Specification for buildings above 18 metres in height_0.pdf(1023.54 KB)
- CEL00003231_Internal Celotex emails regarding draft CTC presentation on RS5000_0.pdf(32.04 KB)
- CEL00003089_Internal Celotex emails regarding a meeting with a cavity fire barrier manufaturer on 13th March 2014 11.00 to 12.30_0.pdf(695.18 KB)
- CEL00003011_Meeting notification for Above 18m Update_2.pdf(10.74 KB)
- CEL00002959_BR 135 - Fire performance of external thermal insulation for walls of multistorey buildings - Third Edition_0.pdf(2.73 MB)
- CEL00003162_Appointment notification for NHBC Meeting - Graham Perrior_ Dave White on 19_06_2014.pdf(12.5 KB)
- CEL00002843_Harley, drawing entitled Specification, C1059-100 Rev I plus handritten notes.pdf(50.04 KB)
- CEL00002841_Drawing Register, Harley.pdf(4.57 MB)
- CEL00002840_Harley, drawings entitled Grenfell Tower Glazing, C1059-WS-129 Rev B, annotated; Grenfell Tower Glazing, C1059-WS-123 Rev A; Grenfell Tower Glazing, C1059-WS-126 Rev -; Grenfell To.pdf(116.46 KB)
- CEL00002839_Harley, drawings entitled Sections, C1059-374 Rev A, annotated; Section C. Wall, C1059-373 Rev A; Sections C. Wall, C1059-362 Rev A; Sections C. Wall, C1059-361 Rev A; Sections C..pdf(433.84 KB)
- CEL00002838_Harley, drawings entitled Sections, C1059-SK02 Rev A, annotated; Sections, C1059-SK01 Rev A; Elevations Levels 1 to 20, C1059-SK04 Rev -; Sections, C1059-SK03 Rev A.pdf(114.99 KB)
- CEL00002837_Harley, drawing entitled Elevations, C1059-222 Rev A, annotated; Sections, C1059-340 Rev A; Sections, C1059-339 Rev A; Sections, C1059-338 Rev A, annotated; Sections, C1059-324 Rev.pdf(509.62 KB)
- CEL00002836_Harley, drawing entitled Grenfell Tower Presswork, C1059-WS-135 Rev -; Grenfell Tower Presswork, C1059-WS-134 Rev -, annotated.pdf(41.63 KB)
- CEL00002835_Harley, drawing entitled Installation Component Locations & Set Out, C1059-504 Rev -, annotated; Sections Entrance Canopy, C1059-371 Rev B.pdf(47.37 KB)
- CEL00002842_Harley, drawing entitled Specification, C1059-100 Rev H.pdf(35 KB)
- CEL00008564_Internal Celotex email FW_ Buildings Above 18m in height_3.pdf(1.17 MB)
- CEL00009879_DOC160718-16072018173739.pdf(2.72 MB)
- CEL00009749_NHBC Letter re the use of Celotex RS5000 PIR insulation in facades above 18m.pdf(5.3 MB)
- CEL00009625_Draft BRE Global Test Report - Celotex RS5000 (Issue 1) - BS8414-2.pdf(5.88 MB)
- CEL00009624_Email re Celotex BR 135 Draft_0.pdf(405.26 KB)
- CEL00009566_MAG Agenda 140514.doc_2.pdf(25.76 KB)
- CEL00008570_Internal Celotex email re Above 18metres.pdf(158.3 KB)
- CEL00008459_Building.co_.uk - Huge Fire Rips Through London Tower Block - Online News - Building - RS5000.pdf(62.11 KB)
- CEL00008528_Handwritten Notes entitled NHBC Meeting.pdf(48.92 KB)
- CEL00008471_Factsheet on Grenfell Tower Fire - PIR RS5000.pdf(85.07 KB)
- CEL00008462_Handwritten Notes Concerning BBC Suffolk - Class O - FR RS NMBC Dated 16th June.pdf(366.89 KB)
- CEL00008460_Handwritten Notes Concerning Grenfell Tower - RS5000 and Celotex Document Titled Warranties - Offered to SPRA Members.pdf(51.14 KB)
- CEL00008389_Handwritten notes from meeting with Tony Baker (BRE) and notes of _The Plan 2013__0.pdf(1.16 MB)
- CEL00003710_Celotex Monthly Report - May 2015_1.pdf(3.55 MB)
- CEL00003674_First draft of Warrington Fire Desktop activity entitled The Fire Performance of Celotex - PIR Façade Cladding Systems when tested following BS 8414 Part 2_2005®.pdf(4.9 MB)
- CEL00003673_Internal Celotex email re first draft of Warrington Fire Desktop activity on RS5000.pdf(1.17 MB)