Date: 10 November 2022 > View this hearingWitness: Max Fordham LLP> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip MAX00023990_Phase 2 Overarching and Module 7 - Written Closing Submissions on behalf of Max Fordham LLP.pdf(7.25 MB) HAR00012257_Email from Rydon to Harley concerning the AOV system and louvres through cladding panels with relevant drawings attached.pdf(412.44 KB) HAR00012258_JS Wright, drawing entitled Walkway Level Distribution Services, 9497_M_203.pdf(508.12 KB) JSW00000008_Paul Hanson MOE observations on AOV submission.pdf(46.74 KB) MAX00004237_Email chain involving Philip Booth and Peter Blythe of Artelia, Bruce Sounes of Studio E, Claire Williams of KCTMO , Matt Smith of Max Fordham and Terry Ashton of Exnova about the.pdf(2.41 MB) MAX00004352_Email from MF to Exova re Grenfell and finger blocks - visit with fire brigade.pdf(3.58 MB) MAX00004373_Emails involving Janice Wray Siobhan Rumble and Claire Williams and Alex Bosman of KCTMO and Matt Smith of Max Fordham about a London Fire Brigade Deficiency Notice in respect of G.pdf(623.76 KB) MAX00004429_RE_ Grenfell - Site Meeting.pdf(1.26 MB) MAX00004667_Email from MF to KCTMO RE_ meeting with Building Control, Rydon, J S Wright, Studio E and PSB re_ AOV.pdf(1.67 MB) MAX00006550_Email from PSB UK to Max Fordham re_ individuals involved in the design of the smoke ventilation _ AOV at Grenfell.pdf(11.33 KB) MAX00006581_Email chain between Max Fordham and PSB UK (Witt UK) re_ Commencing the smoke extract system _ AOV refurbishment. Includes discussion on the extract rate _ flow rate.pdf(2.12 MB) MAX00023546_Email from Exova to Max Fordham LLP explaining smoke extraction needs improving and to be mechanical and should protect escape routes for the many rather than a fire floor..pdf(2.76 MB) PSB00000002_Email chain between PSB [Fergus MacGregor] and Max Fordham [Andrew McQuatt] re AOV wiring control panel.pdf(498.72 KB) PSB00000515_Outlook calendar entry from JSW to PSB re AOV meeting.pdf(76.91 KB) PSB00000592_2 2A. Email from Matt Smith (02.05.14).pdf Smoke extract system refurb - as discussed embedding Max Fordham drawings of the Core Services, Smoke Ventilation Schematic and Studio E.pdf(3.14 MB) PSB00001207_Letter from PSB to Max Fordham Re 1243-12-SC (02.05.14).pdf RE Corridor Smoke Control Systems.pdf(3.43 MB) PSB00001239_PSB, Grenfell Towers Natural Phase 1 Spreadsheet.xlsx.pdf(22.12 KB) RBK00013901_RE_ Grenfell Tower - AOV Technical Submission.pdf(30.13 KB) RYD00026718_Email from JS Wright to Rydon concerning AOV work with relevant technical submission attached.pdf(560.26 KB) TMO10041150_Email from Matt Smith (Max Fordham) to Claire Williams (TMO), Duncan Campbell (Max Fordham), Terry Ashton (Exova), Philip booth (Artelia) and Simon Lawrence with report showing com.pdf(384.33 KB)