Date: 7 November 2022 > View this hearingWitness: BSRs Team 2> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip BSR00000199_Phase 2 Overarching and Module 7 - Written Closing Submissions on behalf of BSR Team 2.pdf(10.61 MB) CEL00002969_Internal Saint-Gobain emails regarding the study on smoke toxicity from insulation products.pdf(588.99 KB) CEL00003038_Presentation entitled 'Fumes and Toxicity Study of Foams'.pdf(2.71 MB) CLG00002029_Local Government Group Guide_ Fire safety in purpose-built blocks of flats (to assist responsible persons to comply with Housing Act 2004 & Fire Safety Order).pdf(152.23 MB) IBI00000486_Grenfell Tower Regeneration Project- Planning Application- Design & Access Statement, embedding drawings of OS Map of the Site 1970, Site Area, Original drawing - Lower Ground Floo.pdf(11.96 MB) KIN00002384_Internal Kingspan correspondence between John Garbutt and Jonathan Ducker coordinating the wording of the document proposing changes to Building Regulations.pdf(8.81 MB) TMO00837521_GT Regeneration project- newsletter to residents. Refers to cladding systems- residents have chosen the zinc system, refers to its advantages.pdf(2.65 MB) TMO00837666_Grenfell Tower Regeneration Project newsletter.pdf(1.08 MB)