Date: 1 July 2021 > View this hearingWitness: Paul Hanson> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RBK00033894_2018.11.21 Witness Statement of Paul Derek Hanson (RBKC)_1.pdf(49.03 MB) RBK00033903_2018.11.21 Second Statement of Paul Derek Hanson.pdf(1.08 MB) IDX0158_Paul Hanson (RBKC Building Control)_0.pdf(51.5 KB) RBK00002978_Email from Paul Hanson to Neil Crawford cc John Hoban_ Grenfell Tower, Grenfell Road Regeneration Project Submission 2, attaching plans with comments_1.pdf(56.55 KB) RBK00002985_Exhibit PDH_10 - Pre-application meeting with design team 17_8_2013 and response to information on the mechanical ventilation system from Max Fordham 11_11_2013_2.pdf(83.65 KB) RBK00003001_Email from Paul Hanson_ _Grenfell Tower, Grenfell Road, London W11 1TH - Fire Authority Consultation__1.pdf(12.73 KB) RBK00003014_Memorandum from Paul Hanson to John Allen_ B1 Means of Escape Observations, Preliminary P2_1.pdf(48.65 KB) RBK00003017_Grenfell Tower - Smoke exhaust LFB submission._1.pdf(80.78 KB) RBK00003020_Memorandum from Paul Hanson to John Hoban - B1 Means of Escape of Observations, Submission 1a, Grenfell Tower._0.pdf(29.69 KB) RBK00003781_Correspondence from David Hughes (Rydon Site Manager) to Paul Hanson (RBKC Senior Building Control Surveyor (Fire Regulations)) regarding Grenfell Tower Building Control Demo._0.pdf(88.29 KB) RBK00003806_Emails between Bruce Sounes (Studio E), John Allen, Paul Hanson (RBKC Building Control), Terry Ashton (Exova) and Duncan Campbell (Max Fordham) re GT refurbishment fire strategy an_1.pdf(25.8 KB) RBK00013223_Document detailing information on completion of regeneration project._2.pdf(222.62 KB) RBK00014933_RBKC Letter from Planning and borough development to KCTMO regarding The Building Regulations 2010 records of the site notes for application FP_14_03563 about Grenfell Tower refurb.pdf(652.72 KB) RBK00029105_Email from Studio E to RBKC re Grenfell LFB consultation response._0.pdf(19.61 KB) RBK00033895_Exhibit PDH_6 - Submission _ (S1) 10_11_2014_3.pdf(1.93 MB) RBK00033896_Exhibit PDH_11 - First Fire Authority consultation request 11_11_2014_1.pdf(2.73 MB) RBK00033897_Exhibit PDH_12 - Second Fire Authority consultation request_2.pdf(28.48 MB) RBK00033898_Exhibit PDH_2 - Excerpt from section 20 'yellow code'_0.pdf(2.17 MB) RBK00033899_Exhibit PDH_1 - CV Paul Hanson_0.pdf(1.34 MB) RBK00033900_Exhibit PDH_7 - Submission 1a (S1a)_0.pdf(28.37 MB) RBK00033901_Exhibit PDH_5 - Preliminary application 2 (P2) 6_12_2013_0.pdf(2.54 MB) RBK00033902_Exhibit PDH_9 - Existing Dry riser - email chain regarding control under Building regulations_0.pdf(1.13 MB) RBK00033904_Exhibit PDH_4 - Preliminary application 1 (P1)_1.pdf(989.79 KB) RBK00033905_Exhibit PDH_8 - Submission 2 (S82) 26_1_2016.pdf(25.91 MB) RBK00033906_Exhibit PDH_3 - GLC tutorials illustrating external enclosures.pdf(736.2 KB) RBK00058263_Exhibit PDH_10 - Pre-application meeting with design team 17_8_2013 and response to information on the mechanical ventilation system from Max Fordham 11_11_2013.pdf(2.17 MB) BMER0000007_Supplementary Report by Beryl Menzies regarding the smoke control installation that formed part of the Building Regulations application associated with the refurbishment of Grenfel.pdf(21.1 MB) BSI00000621_BS 9991_ 2011 - Fire safety in the design, management and use of residential buildings - Code of Practice.pdf(87.63 MB) CST00001230_Memorandum from Paul Hanson to John Hoban (RBKC Building Control) re B1 Means of Escape Observations for Grenfell Tower Submission S2.pdf(42.04 KB) JSW00000004_Request from BC to amend wording on smoke control proposals - omission of para stating that the system is not designed to comply with all the requirements of the Code of Practice B.pdf(711.85 KB) JSW00001747_E-mail from Paul Hanson (RBKC BC) to David Bradbury (JSW) attaching BC's comments re_ the AOV.pdf(36.03 KB) JSW00002761_Re Grenfell Tower email from David bradbury to Phil booth regarding the design of the proposed AOV system at Grenfell Tower and arranging a meeting.pdf(228.66 KB) JSW00002945_Email from Alan Whyte to david bradbury attaching guidance on smoke control.pdf(1.27 MB) JSW00003149_email from David Bradbury to Paul Hanson (RBKC) and John Hoban (RBKC) attaching technical submission provided by PSB.pdf(425.82 KB) JSW00003637_Email from JSW to Rydon re PSB smoke control Tech Sub verbally agreed.pdf(509.68 KB) MAX00002655_Building Control Completion Certificate - Grenfell Tower.pdf(395.79 KB) MAX00003916_Emails between Studio E and RBKC - Fire Strategy - John Allen (building control manager at RBKC) responding to the fire strategy from Studio E- document unsatisfactory and the addi_0.pdf(1.08 MB) MAX00004795_RE_ Grenfell Smoke system_0.pdf(351.3 KB) MET00072161_MPS - Rina report - HVAC Logic and Functionality Testing, dated 30 October 2020.pdf(13.73 MB) RBK00002932_Smoke Control Association Guidance on Smoke Control to Common Escape Routes in Apartment Buildings_Revision 2 Oct 15..pdf(15.42 MB) RBK00003390_RBKC Management Board 26 March 2014, Cabinet, 1 May 2014_ Report by Director of Housing, Budget Monitoring 2013_14.pdf(1.63 MB) RBK00003787_Studio E, Drawing entitled _ Fire Access Plan_, 1279 (08) 100, Rev 00, Employer's Requirements, annotated.pdf(1.92 MB) RBK00003789_plan with comments by RBKC Building Control.pdf(873.21 KB) RBK00014957_Memorandum from Paul Hanson to John Hoban regarding B1 - Means of Escape Observations for Grenfell Tower..pdf(69.08 KB) RBK00033907_Exhibit PDH_10 - Pre-application meeting with design team 17_8_2013 and response to information on the mechanical ventilation system from Max Fordham 11_11_2013.pdf(2.17 MB) RBK00045054_British Standard BS EN 12101-6_2005 - Smoke and Heat Control Systems - Part 6_ Specification for pressure differential systems - Kits.pdf(3.87 MB) RBK00064294_DS Memos 93 Job alllocation from JA Jackson to All Technical Staff; Subject_ New Arrangements with regard to Means of Escape.pdf(155.68 KB) RBK00064295_DS Technical Memo No.62.pdf(888.29 KB) SEA00000160_Email chain between Terry Ashton, Exova and Duncan Campbell, Maxfordham regarding ventilation strategy, presentation to RBKC Building Control, comparison of current and new system,.pdf(639.4 KB) TMO10039880_Max Fordham, drawing entitled Core Services Smoke Ventilation Schematic, U(14)01_200T1.pdf(516.59 KB)