Date: 13 July 2021 > View this hearingWitness: Matthew Dolan> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip MET00012711_Witness statement - Construction and Use - Matthew Dolan Contract Director of Skanska Construction, tRIIO Contract Director.pdf(10.65 MB) TRI00001797_2018.10.05 - Witness Statement of Matthew Dolan (tRIIO).pdf(4.72 MB) CAD00000035_Email correspondence between Patrick Kelly (Cadent) and Jayne Burder (tRIIO) regarding MOBS Performance Call..pdf(1.03 MB) CAD00000038_Email from Simon Boygle (London Ops) to Harvey Smith (tRIIO), Stuart Stevens (tRIIO), Cerianne Talbot (tRIIO), MOBS and K&S Pipe Contractors LLP regarding proposed route for replac.pdf(2.38 MB) CAD00000054_Email correspondence_ between Martyn Wisken (tRIIO) and Ashley Johnson (tRIIO), Harvey Smith (tRIIO), Simon Boygle (London ops gas) and RBKC_TMO regarding attached revised design f.pdf(4.77 MB) CAD00001640_Photograph_ stairwell level 4.pdf(527.69 KB) CAD00001653_Photograph_ Lateral gas riser going into hole.pdf(645.24 KB) CAD00001910_Photograph_ vertical gas riser, looking down on stairwell landing.pdf(389.16 KB) CST00003082_Grenfell Tower Gas main installation Jan 2017.pdf(362.34 KB) MET00016516_Photograph of pipes taken by SOCO Oli Kenny during visit to Grenfell Tower on 30th May 2018.pdf(257.91 KB) MET00016651_Photograph of pipes taken by SOCO Oli Kenny during visit to Grenfell Tower on 30th May 2018.pdf(260.03 KB) MET00016722_Photograph of pipes taken by SOCO Oli Kenny during visit to Grenfell Tower on 30th May 2018.pdf(318.42 KB) RBK00003601_Re_ Stakeholders Meeting with KCTMO & RBKC ref_ Grenfell Tower.pdf(437.89 KB) TMO00828915_Correspondence from Charlie Saul to Harvey Smith and in cc Martyn Wisken regarding National Grid works at Grenfell Tower..pdf(160.57 KB) TMO00833486_Email from Charlie Saul (TMO) to Harvey Smith (tRIIO) with queries with re gas pipe boxing.Subject_ RE_ IMGM170186- Grenfell Tower.pdf(517.16 KB) TMO10015271_Response email from TRIIO to KCTMO regarding the boxing around the pipework at Grenfell Tower and whether it affects compartmentalisation and fire safety..pdf(1.52 MB) TRI000000044_Correspondence from London Ops Gas to tRIIO and K&S detailing route of new gas riser.pdf(986.77 KB) TRI000000263_tRIIO drawing, untitled, IMGM 170 186, showing vertical and lateral riser design.pdf(502.81 KB) TRI000000369_CDM Design Risk Register prepared by tRIIO.pdf(669.57 KB) TRI000000985_Correspondence_ Cadent to tRIIO, re state of works on gas riser. Notes fire hazard. Embedded image of works..pdf(274.52 KB) TRI000001035_Correspondence between tRIIO and Cadent regarding works on gas riser..pdf(531.21 KB) TRI000001223_tRIIO drawing, untitled, IMGM 170 186, showing vertical and lateral riser design updated with revised boxing design.pdf(538.39 KB) TRI000001377_Technical data sheet for Enviroboards Fire Board and Uni Board.pdf(2.21 MB) TRI000001431_Photograph - Gas riser works outside of flat 141.pdf(1 MB) TMO10015305_Email from C S Stokes to Janice Wray at KCTMO regarding Gas Reinstatement at Grenfell Tower. Also the boxing around the pipework and whether it affects compartmentalisation and fir.pdf(147.44 KB)