Downloads
- MAX00017304_Witness Statement of Matt Cross Smith (Max Fordham LLP)..pdf(32.29 MB)
- IDX0112_Matt Cross Smith (Max Fordham).pdf(66.92 KB)
- MAX00000058_Max Fordham - Grenfell Tower Heating Options Appraisal_1.pdf(2.06 MB)
- MAX00000147_Studio E notes from Meeting 5, Project Meeting held on 18 July 2012_0.pdf(1.99 MB)
- MAX00000163_Max Fordham - Grenfell Tower Overheating Report.pdf(5.85 MB)
- MAX00000262_Spreadsheet of Grenfell Tower Planning and Building Regulation Requirements.pdf(1.13 MB)
- MAX00000312_Various documents from Artelia, Exova, Syntegra Consulting including an agenda for a meeting on 21_09_12, a drawing of Grenfell Tower with handwritten notes, Grenfell Tower Fire Sa.pdf(14.75 MB)
- MAX00000450_Exova Outline Fire Safety Strategy.pdf(3.8 MB)
- MAX00000723_Appleyards Grenfell Tower Refurbishment - (Draft) Revised Brief at June 2013_1.pdf(3.11 MB)
- MAX00000724_Max Fordham - Sustainability & Energy Statement (Rev C) - Grenfell Tower Refurbishment_0.pdf(5.44 MB)
- MAX00000759_Max Fordham - table of draft proposals_queries_discussion points.pdf(2.11 MB)
- MAX00000772_Max Fordham - Grenfell Tower Schedule of Pre-Tender M&E Surveys - Stage D.pdf(894.03 KB)
- MAX00000960_Max Fordham - Grenfell Tower Employer's Requirements for MEP Services_3.pdf(24.76 MB)
- MAX00001021_Morgan Fire Protection Ltd - Dry Riser Certificate (Wet Test & Flow Test).pdf(643.8 KB)
- MAX00001049_Max Fordham - Grenfell Tower - Part L Building Regulations.pdf(286.52 KB)
- MAX00001414_RGE Services - Maintenance Report - Smoke Vent System_0.pdf(2.04 MB)
- MAX00001426_Significant Findings and Action Plan for Grenfell Tower_0.pdf(3.88 MB)
- MAX00001447_Memorandum from Paul Hanson to John Allen (both RBKC) containing advice regarding the proposed AOV.pdf(43.12 KB)
- MAX00001651_Max Fordham - Smoke Ventilation Analysis.pdf(2.81 MB)
- MAX00001683_Max Fordham - Grenfell Tower Refurbishment M&E Stage C Report (Rev B)_2.pdf(24.36 MB)
- MAX00001750_Max Fordham - Site Meeting Report 1.pdf(800.73 KB)
- MAX00001945_JS Wright, drawing entitled Dry Riser Schematic, 9497_M_105 Rev A.pdf(540.86 KB)
- MAX00002079_Max Fordham - Site Meeting Report 5.pdf(1023.84 KB)
- MAX00002164_Studio E, drawing entitled Setting Out Plan Walkway Plan, 1279 (22) 103, Rev 11.pdf(540.8 KB)
- MAX00002217_Memorandum regarding the smoke ventilation technical submission.pdf(11.85 KB)
- MAX00002240_AOV shaft extension route explained.pdf(1.12 MB)
- MAX00002279_John Rowan and Partners- Works Progress Report No. 20.pdf(2.86 MB)
- MAX00002288_Max Fordham- Grenfell Tower Site Meeting Report 9.pdf(1.2 MB)
- MAX00002348_JSW Grenfell Tower Progress Meeting.pdf(1.8 MB)
- MAX00002442_PSB - Grenfell Tower Technical Submission for Lobby Smoke Control Systems Rev 4 with MF comments.pdf(8.75 MB)
- MAX00002476_PSB - Grenfell Tower Technical Submission for Lobby Smoke Control Systems Rev 6.pdf(9.03 MB)
- MAX00002604_Letter of Comfort from Building Control.pdf(822.33 KB)
- MAX00002821_Email from Max Fordham to Studio E regarding U-values and the cladding.pdf(189.93 KB)
- MAX00002899_Email regarding a meeting cancellation and on queries to Rockwool and Kingspan on insulation options, and attaching a Rockwool Rainscreen Duoslab insulation conductivity chart and.pdf(716.01 KB)
- MAX00002900_Email regarding proposed window and cladding system and attaching a photo of a considered pantograph window.pdf(804.85 KB)
- MAX00003007_Email from MF to KCTMO -Grenfell Tower - Smoke extract design- specification for the smoke extract system for GT..pdf(309.59 KB)
- MAX00003118_Emailing attaching a Grenfell Tower Planning and Building Regulations Requirements spreadsheet on section L of the regulations, containing proposed refurbishment by level, and work_0.pdf(365.6 KB)
- MAX00003154_Emails between KCTMO, Studio E and MF- fire strategy- query re specification for the upgrade to the alarm and smoke extract. LFB requiring replacement of system following fire in_0.pdf(1.47 MB)
- MAX00003293_Email from Max Fordham to TMO regarding the new power supplies for Grenfell Tower.pdf(480.37 KB)
- MAX00003332_Emails between Exova, Studio E and Max Fordham attaching outline fire strategy.pdf(389.17 KB)
- MAX00003343_Emails between Studio E and Max Fordham regarding fire related items including the AOV, dry riser and mechanical and natural ventilation_0.pdf(619.77 KB)
- MAX00003350_Emails between Exova and Studio E regarding RBKC Building Control advice on the refurbishment and fire fighting, smoke ventilation and means of escape detection and containment_0.pdf(2.15 MB)
- MAX00003360_Email from Max Fordham to Exova and Studio E informing them about the existing smoke extract system and seeking advice on installing new supply air fans on the walkway level.pdf(891.65 KB)
- MAX00003381_Email from Max Fordham to Artelia, Studio E, and KCTMO copied to Taylor Young, Curtins Consulting, Exova and others re Stage D Report - M&E_2.pdf(247.37 KB)
- MAX00003565_Emails between Max Fordham and Appleyards attaching the Sustainability and Energy Statement (rev C) and discussing VE options that were disregarded by TMO.pdf(679.74 KB)
- MAX00003610_Re_ design review meeting - M&E focus.pdf(1.33 MB)
- MAX00003676_Email from KCTMO to MF, Artelia and Studio E - Grenfell tower electric certificates on fire alarm, smoke extraction system dry riser testing and lighting protection.pdf(743.9 KB)
- MAX00003828_Re_ Grenfell - all of your tender paperwork.pdf(1.08 MB)
- MAX00003834_Grenfell Tower - fire alarm systems.pdf(646.89 KB)
- MAX00003855_Email between Artelia and Max Fordham attaching building regulations extract.pdf(250.32 KB)