Downloads
- MAX00003112_Email from B Sounes to A McQuatt re_ Refurbishment Works - Budget Cost Estimate nr. 1_0.pdf(1.56 MB)
- MAX00003118_Emailing attaching a Grenfell Tower Planning and Building Regulations Requirements spreadsheet on section L of the regulations, containing proposed refurbishment by level, and work_1.pdf(365.6 KB)
- MAX00003174_Emails regarding possible savings for the project, total construction and project costs, and attaching the Exova Fire Safety Strategy advice.pdf(1.74 MB)
- MAX00003175_Emails between Appleyards, Curtins, KCTMO - Grenfell Tower Regeneration Project - Cost Plan nr. 3- fire strategy, budgets..pdf(1.99 MB)
- MAX00003250_Emails between Exova and Max Fordham regarding the proposal for upgrading the smoke extract system.pdf(1.52 MB)
- MAX00003295_Email attaching the Grenfell Work Packages spreadsheet, containing a list of works under the categories of Architectural, Structural, Fore Safety, Acoustic, M&E, and Security & Acc.pdf(558.63 KB)
- MAX00003343_Emails between Studio E and Max Fordham regarding fire related items including the AOV, dry riser and mechanical and natural ventilation_1.pdf(619.77 KB)
- MAX00003350_Emails between Exova and Studio E regarding RBKC Building Control advice on the refurbishment and fire fighting, smoke ventilation and means of escape detection and containment_1.pdf(2.15 MB)
- MAX00003361_Email to Studio E from Max Fordham asking about refuge areas in lobbies.pdf(201.28 KB)
- MAX00003452_Emails discussing and attaching the RBKC and Leadbitter Pre-Construction Agreement for the Kensington Academy & Leisure Centre (KALC) Project.pdf(2.77 MB)
- MAX00003637_Email regarding anticipated building control fees.pdf(235.83 KB)
- MAX00003671_Emails between Curtins and Max Fordham - Grenfell Tower - alternative riser position embedded with unnamed, undated drawing.pdf(822.6 KB)
- MAX00003741_RE_ Grenfell - Actions from M&E meeting.pdf(3.86 MB)
- MAX00003754_Email From Studio E with regards to Exova's Fire Strategy documents ..pdf(2.26 MB)
- MAX00003780_email re Grenfell - overcladding VE_.pdf(633.84 KB)
- MAX00003794_Email from Bruce Sounes (Studio E) Grenfell - Smoke exhaust LFB submission._0.pdf(677.42 KB)
- MAX00003800_Email enclosed with Studio E, unnamed drawing.pdf(854.02 KB)
- MAX00003834_Grenfell Tower - fire alarm systems_0.pdf(646.89 KB)
- MAX00003897_Email from MF to RBKC re Grenfell Tower - Smoke exhaust LFB submission..pdf(1.16 MB)
- MAX00003916_Emails between Studio E and RBKC - Fire Strategy - John Allen (building control manager at RBKC) responding to the fire strategy from Studio E- document unsatisfactory and the addi_1.pdf(1.08 MB)
- MAX00003961_RE_ FW_ 11833 Grenfell Tower - Pricing Document - Cost options & Prov Sum.pdf(1.8 MB)
- MAX00004041_Email between MF and Artelia attaching Part L Building Regulations proposing it forms part of the main contract scope of works.pdf(277.08 KB)
- MAX00004158_email FW_ Grenfell Tower, Grenfell Road, Refurbishment - Fire Strategy P2.pdf(3.63 MB)
- MAX00004179_FW_ Grenfell Tower, Grenfell Road, Refurbishment - Fire Strategy P2_2.pdf(4.09 MB)
- MAX00004219_email re_ Grenfell Tower - Lobby Smoke Venting_0.pdf(666.54 KB)
- MAX00004230_Email chain involving Philip Booth and Peter Blythe of Artelia, Bruce Sounes of Studio E, Claire Williams of KCTMO , Matt Smith of Max Fordham about the production of a Ventilation.pdf(1.36 MB)
- MAX00004236_email RE_ Grenfell Tower - Lobby Smoke Venting_0.pdf(1.85 MB)
- MAX00004253_Email from MF to RGE Services Grenfell re smoke extract system demo.pdf(283.18 KB)
- MAX00004281_RE_ Grenfell Tower - Lobby Smoke Venting_0.pdf(1.4 MB)
- MAX00004288_RE_ Grenfell Tower Contract Email discussion re congtract.pdf(707.3 KB)
- MAX00004309_Email from Studio E to KCTMO re Grenfell and smoke vent lobbies - fire brigade session.pdf(902.4 KB)
- MAX00004335_Email from Studio E to Exova re Grenfell and smoke vent lobbies - fire brigade session.pdf(1.78 MB)
- MAX00004345_Email from MF to Studio E re Grenfell and finger blocks - visit with fire brigade.pdf(1.98 MB)
- MAX00004428_Grenfell - Site Meeting_0.pdf(335.71 KB)
- MAX00004511_Grenfell Tower_0.pdf(478.54 KB)
- MAX00004519_Grenfell - Fire alarm auto-dialler_0.pdf(324.05 KB)
- MAX00004520_Grenfell - Smoke extract report.pdf(530.59 KB)
- MAX00004521_Email exchange between Matt Smith of Max Fordman and Dave Bradbury of JS Wright about the Grenfell Smoke Extraction System..pdf(745.13 KB)
- MAX00004633_Email re. window report in relation to overheating.pdf(376.62 KB)
- MAX00004638_Email from MF to KCTMO re requesting assistance in interpreting the AOV drawings- KCTMO advised to contact Exova instead..pdf(1015.26 KB)
- MAX00004652_Cancelled_ Grenfell Tower AOV.pdf(322.04 KB)
- MAX00004665_Email re_ meeting with Building Control, Rydon, J S Wright, Studio E and PSB re_ AOV_1.pdf(1.12 MB)
- MAX00004792_Email from David Bradbury of JS Wright to Matt smith of Max Fordham attaching Technical submission for Grenfell AOV.pdf(790.88 KB)
- MAX00004794_Description_ Email chain involving Simon O’Connor of Rydon, Claire Williams of KCTMO Philip Booth of Artelia and Matt Smith of Max Fordham about the Grenfell Tower Smoke_Fire Sys_0.pdf(4.1 MB)
- MAX00004795_RE_ Grenfell Smoke system_1.pdf(351.3 KB)
- MAX00004813_Email from MF to KCTMO re JSW's technical submission re AOV.pdf(721.27 KB)
- MAX00004931_Email re. Grenfell Tower - Smoke extract supply shaft with Studio E, drawing entitled Walkway +1 Level.pdf(601.98 KB)
- MAX00005329_Email involving RBKC, J S Wright and Rydon discussing Grenfell Tower AOV technical Submission_0.pdf(1.31 MB)
- MAX00005355_Email from Matt Smith to David Bradbury regarding Grenfell Tower Refurb latest CP drawings_0.pdf(1.72 MB)
- MAX00005356_Email from David Bradbury to Matt Smith regarding Grenfell Tower Refurb latest CP drawings.pdf(1.77 MB)