Downloads
- ART00000184_Email from B Sounes (Studio E) to C Barker (Exova) cc P Dunkerton (KCTMO) and A Dawson (Appleyards) re Exova's appointment to Grenfell Tower Regeneration Project.pdf(328.13 KB)
- EXO00000541_Email KCTMO, Appleyards and Exova re 301922 Grenfell Tower.pdf(1.99 MB)
- EXO00000542_Email from RBKC to Appleyards, Studio E re_ billing address for invoices.pdf(675.12 KB)
- EXO00000667_Emails between Cate Cooney and Terry Ashton (Exova) re proposed fire strategy for Grenfell Tower.pdf(1 MB)
- EXO00000856_Studio E, drawing entitled 'Proposed Floor Plans' 1279 RE110 Rev 05..pdf(1.81 MB)
- EXO00000860_Studio E, drawing entitled 'Proposed Walkway Plan' 1279 RE113 Rev 04..pdf(1.08 MB)
- EXO00000861_Studio E, drawing entitled 'Proposed Walkway +1 Floor Plan' 1279 RE114 Rev 03..pdf(1.04 MB)
- EXO00000961_Studio E, drawing entitled 'Proposed Ground Floor Plan', 1279 PL111 Rev 01, annotated..pdf(1.42 MB)
- EXO00000962_Studio E, drawing entitled 'Proposed Mezzanine Floor Plan', 1279 PL112 Rev 01, annotated..pdf(715.31 KB)
- EXO00000980_Studio E, drawing entitled 'Proposed Walkway Plan', 1279 PL113 Rev 01, annotated..pdf(311.21 KB)
- EXO00001319_Harley Specification Notes.pdf(35.52 KB)
- HAR00012077_Email from Studio E to Harley and Rydon re_ RFI001 requirement for fire breaks.pdf(1.37 MB)
- MAX00006093_Email from Exova to Rydon re Grenfell Tower - fire alarm to the hub room.pdf(2.74 MB)
- RYD00082268_Email from Rydon to Studio E re alterations required to fire strategy drawing.pdf(9.86 KB)
- SEA00006726_Email re Revised Layouts and impact on fire strategy.pdf(1.27 MB)
- SEA00006727_Studio E, drawing entitled Proposed Mezzanine Floor Plans, 1279RE112 Rev 06 annotated..pdf(1.02 MB)
- TMO00830016_Studio E Drawing entitled _ Existing Sections and Elevations_, 12-009 SK003, Rev 00.pdf(43.85 KB)
- TMO00831044_Studio E, drawing entitled Existing Floor Plans, 12-009 SK001, Rev 01.pdf(32.18 KB)
- TMO10013339_Studio E drawings entitled _Fire Access Plan_1279(08)100, Issue 06; _Fire Access Plan_ 1279(08)100, Issue 07; _Fire Strategy_ 1279(08)101, Issue 05..pdf(1.98 MB)