Downloads
- ARC00000701_Internal Arconic email from Vince Meakins to Claude Wehrle attaching Booth Muriie Technical Note on cladding.pdf(191.56 KB)
- ARC00000702_Booth Muirie's Guide to Designing Approved Document B2 Compliant Multi Layered Walls Featuring Rainscreen Panel Systems Formed from Aluminium Composite Material (ACM).pdf(1.58 MB)
- ART00000062_Fee proposal from T Ashton (Exova Warringtonfire) to B Sounes (Studio E) for fire safety engineering consultancy services for the Grenfell Tower Regeneration Project.pdf(9.52 MB)
- ART00000186_Fee proposal from T Ashton (Exova Warringtonfire) to B Sounes (Studio E) for fire safety engineering consultancy services for the Grenfell Tower Regeneration Project.pdf(9.52 MB)
- ART00001868_Exova Outline Fire Safety Strategy, Issue 03, original date 31 October 2012.pdf(4.34 MB)
- ART00002084_Email - Lim to Williams, Jackson, Maddison, Gibson re review of pre-tender estimates, attaching tender inclusive of M&E changes.pdf(221.32 KB)
- ART00002133_Draft Tender Report.pdf(8.39 MB)
- ART00003468_Artelia Meeting Minutes- Progress Meeting No 7, held on 20 January 2015.pdf(1.89 MB)
- CCL00003310_2014.10.10 Grenfell Tower Buidling Control Submission Rev 01 embedding drawings of the ground floor, mezzanine floor, walkway level floor, office level floor, Main entrance, Existi.pdf(37.21 MB)
- CEL00001330_NHBC technical guidance note.pdf(3.09 MB)
- CEL00001878_Technical Note_ Fire Performance of Curtain Walls and Rain Screens - Centre for Window and Cladding Technology..pdf(1.41 MB)
- CEL00002375_BRE Global Test Report- Celotex Insulation- RS5000 insulation board.pdf(2.85 MB)
- CEL00004352_Spreadsheet entitled Copy of Celotex Assessments from Exova between 07_05_2015- 08_05_207 - RS5000.pdf(252.79 KB)
- CEL00008861_Document entitled Specification_ Competitor Specification Conversion RS5000.pdf(590.74 KB)
- CEL00008862_Presentation entitled RS5000 Euroclass classification and BBA certification - Review.pptx.pdf(1.47 MB)
- CEP000000074_Email From Leadbitter to CEP RE_ Enquiry for costs re external envelope.pdf(479.53 KB)
- CEP000008351_Email Xerxes to CEP regarding reynobond quote and order - which had Grenfell tower stated on them..pdf(364.64 KB)
- CEP00048963_Computer generated image of proposed _crown view_; final upper section of exterior appearance of the Grenfell Tower - showing placement of cladding, spandrels, columns and sandwich.pdf(304.38 KB)
- CEP00048964_Computer generated image of proposed _entrance view_; final lower section of exterior appearance of the Grenfell Tower - showing placement of cladding, spandrels, columns and sandw.pdf(324.6 KB)
- CEP00048965_Computer generated image of proposed _walkway view_; final exterior appearance of the Grenfell Tower - showing placement of cladding, spandrels, columns and sandwich panels.pdf(456.41 KB)
- CEP00048967_Studio E, drawing entitled _Proposed Elevation, Plan & Section Detail_, 1279 RE140 Rev 00.pdf(329.97 KB)
- CEP00048969_Studio E drawing entitled Proposed Sections, RE200 01, Revision 01.pdf(327.74 KB)
- CEP00048972_Studio E drawing entitled _Proposed Part Plan & Elevation_, 1279 RE400 Rev 02.pdf(210.94 KB)
- CEP00050720_Studio E- Grenfell Tower- H92 Rainscreen Cladding Specification.pdf(5.7 MB)
- CEP00050819_Reynobond- Brochure.pdf(5.52 MB)
- CLG00001226_Fire Brigades Union Discussion Paper for 7th Meeting of Fire Safety Advisory Board_ Proposals for Amending Part B Fire Safety - European Supplement - The Generation of Smoke.pdf(62.93 KB)
- CLG00001506_Revised BRE Project Report (for Building Regulations Division)_ Review of cavity barrier guidance in AD B and general literature review (marked up copy).pdf(1022.94 KB)
- CLG00002347_Revised BRE Project Report (for Office of the Deputy Prime Minister Buildings Division)_ Forward Look - Fire Safety Framework, Review of Part B (marked up) (BD 2469).pdf(26.06 MB)
- CWCT0000009_CWCT Standard for systemised building envelopes_ Part 6 - Fire performance of building envelopes (Draft 3.6.vii_.2007).pdf(3.53 MB)
- EXO00000587_T Rek (Studio E) to T Ashton (Exova) email re rainscreen cavity fire barriers.pdf(1.18 MB)
- EXO00000604_Emails between Matt Smith (Max Fordham), Bruce Sounes (StudIo E) and Terry Ashton (Exova) re site visit, EMB office options, boxing club layout and smoke control vents.pdf(683.06 KB)
- EXO00000806_Studio E, drawing entitled Detail Section Sheet 1, 1279 (06) 120 Rev 00.pdf(518.46 KB)
- EXO00000923_Minutes of pre-application meeting between RBKC, Max Fordham, Taylor Young, Studio E dated 19 July 2012.pdf(851.42 KB)
- EXO00000981_Harley, C1059-200 Rev -. C1059-300 Rev -. C1059-301 Rev -. C1059-302 Rev -. C1059-303 Rev -. C1059-304 Rev A. C1059-305 Rev -. C1059-306 Rev -. C1059-SK01 Rev -. C1059-SK02 Rev -..pdf(232.32 KB)
- EXO00001359_Minutes of Design Team Meeting from 19_04_2012.pdf(2.32 MB)
- EXO00001573_Emails between Claire Williams (TMO), Bruce Sounes (Studio E), Tom Ashton (Curtins), Terry Ashton (Exova) and Max Fordham re GT external stair configuration®.pdf(1.2 MB)
- HAR00000553_Harley purchase order to Newbrel Ltd (CW Panels).pdf(2.62 MB)
- HAR00000955_Email from Mark Harris to Mike Albiston regarding zinc patina cladding and not showing the option to planners.pdf(9.9 KB)
- HAR00005498_Email chain regarding planning rainscreen cladding samples and material, attaching Reynobond BBA Specimen Warranty.pdf(52.84 KB)
- HAR00006255_Harley drawings Entitled _Elevations_ and _Sections_, C1059-200 Rev A, C1059-300 Rev A; C1059-301 Rev A; C1059-302 Rev A; C1059-303 Rev A; C1059-304, Rev B; C1059-305 Rev A; C1059-.pdf(221.06 KB)
- HAR00006302_Studio E, drawing entitled Proposed West Elevation, 1279 PL 312 Issue 01..pdf(4.65 MB)
- HAR00006303_Studio E, drawing entitled Proposed East Elevation, 1279 PL 313 Issue 01..pdf(4.52 MB)
- HAR00006304_Studio E Drawing Entitled _Proposed South Elevation_ 1279 PL 314 Rev 01.pdf(419.85 KB)
- HAR00006305_Studio E Drawing Entitled _Proposed North Elevation_ 1279 PL 315 01.pdf(390.06 KB)
- HAR00006711_Harley Plans Entitled _Elevations_ C1059-216; C1059-217; C1059-218; C1059-332; C1059-335; C1059-334; C1059-335; C1059-336; C1059-337 with Studio E annotations.pdf(8.12 MB)
- HAR00008465_Harley, drawing entitled Elevations, C1059-200 Rev E.pdf(30.8 KB)
- HAR00012091_Harley request for information sent to Rydon concerning the extent of horizontal firebreaks within the cladding areas.pdf(257.37 KB)
- HAR00013446_Grenfell Tower Harley budget costs submitted for external cladding.pdf(341.6 KB)
- HAR00015406_Emails between Proteus and Harley re quotations for supply only of Proteus HR zinc and aluminium rainscreen cladding to residential levels, and markup for pricing to lower levels.pdf(1.24 MB)
- IBI00000465_Grenfell Tower Regeneration Project- Planning Application- Sustainability and Energy Statement, embedding drawings of Area Weighted U-Value Calculation Area, Spandrel Wall Panel wi.pdf(7.91 MB)
- IBI00001799_Email from RBKC to IBI request for drawing showing colours..pdf(16.48 KB)
- IBI00001805_Emails between Studio E, Rydon,TMO RBKC and IBI discussing colour options for cladding.pdf(51.03 KB)
- JSW00000294_JS Wright letter to Rydon requesting changes to the letter of intent_0.pdf(35.35 KB)
- JSW00001792_E-mail chain between JS Wright and RBKC Building Control re_ Obtaining BC Approval for Dry Riser.pdf(54.65 KB)
- KIN00000087_Kingspan document_ technical bulletin entitled 'Routes to Compliance_ Fire Safety For Facades Incorporating Kingspan Kooltherm K15 Rainscreen Board on Buildings with a Habitable St.pdf(13.37 MB)
- LBI00000017_Email from Studio E to Leadbitter beginning discussions on Grenfell Tower project.pdf(501.77 KB)
- LBI00000031_Email from TMO to Colin Chiles, copying RBKC, Chris Carey (Hants) and Cliff Thomas (Leadbitter) regarding Grenfell Tower Regeneration Project.pdf(64.86 KB)
- LBI00002536_Email between Leadbitter and HCD Building Control regarding a query about insulating the cladding and u-values for VE exercise.pdf(868.57 KB)
- MAX00006095_Emails between T Batty (Silcock Dawson), T Ashton (Exova) and D Hughes (Rydon) cc multiple contractors, forwarding earlier emails between A Bridges (R J Electrics), T Ashton and T.pdf(3.03 MB)
- MAX00018104_Employer's Requirements for MEP Services.pdf(7.83 MB)
- RBK00000141_Email between Amanda Johnson (RBKC) and Peter Maddison (TMO) & others discussing concerns raised in email from Grenfell Tower Leaseholders' Association and how to respond..pdf(70.1 KB)
- RBK00000232_Covering letter from IBI Taylor Young to RBKC - Senior Planning Officer regarding resubmission of revised plans_planning application for Grenfell Tower refurbishment works.pdf(48.29 KB)
- RBK00000262_Decision notice from RBKC to IBI Taylor Young regarding discharge of conditions on change of external cladding colours and windows for Grenfell Tower.pdf(30.22 KB)
- RBK00000360_Grenfell Tower TMO Operations Committee report regarding Grenfell Tower funding and work undertaken and proposed action.pdf(84.52 KB)
- RBK00000374_RBKC cabinet meeting report re use of capital receipts arising from sale of basement spaces at Elm Park Gardens and use of funding for Grenfell Tower.pdf(645.78 KB)
- RBK00000622_Grenfell Tower Regeneration Project Studio E Stage D Report - 4 Architects Report regarding Architects Appraisal Panel, Planning Re-invigoration - July 2013 embedding drawings of.pdf(100.31 KB)
- RBK00002316_Summary Agenda from Grenfell Tower Leaseholder's Association regarding a meeting of Stakeholders VS Council executive and their appointed Managing agents K&CTMO and others about Gr.pdf(61.05 KB)
- RBK00002326_Emails between Cllr Judith Blackman (RBKC) and Laura Johnson (RBKC) and others re Grenfell Tower Leaseholders' Association request for an Independent Health and safety inspector fo.pdf(96.45 KB)