- ARC_T000014_Certified French translation of ARC00000415.pdf(6.42 MB)
- ARC00000608_Exova Warrington BS 476_ Part 7_ 1997 test of Reynobond FR.pdf(3.46 MB)
- ARC00000610_Exova Warrington BS 476_ Part 6_ 1989+A1_2009, test of Reynobond FR.pdf(3.41 MB)
- BBA00009153_CSTB Reaction to Fire Classification Report No. RA15-0200 According to the European Standard NF EN 13501-1+A1_2013 for Alcoa Reynobond 55 PE..pdf(1.56 MB)
- BBA00009746_Emails from Brian Moore, Operations Director of BBA, to Claude Wherle and Claude Schmidt of Arconic regarding changes to the PE material in the core of the Reynobond PE product, fo.pdf(3.29 MB)
- BSI00000087_BS 5588-5_2004 Fire precautions in the design, construction and use of buildings. Part 5_ Access and facilities for fire-fighting..pdf(14.8 MB)
- BSI00000090_BS EN 81-1_1998 Safety rules for the construction and installation of lifts. Part 1_ Electric lifts..pdf(4.13 MB)
- BSI00000119_BS EN 13823 2002 Reaction to fire tests for building products. Building products excluding floorings exposed to the thermal attack by a single burning item..pdf(21.68 MB)
- BSI00000166_BS 8414-1_2015 Fire performance of external cladding systems - Part 1_ Test method for non-loadbearing external cladding systems applied to the masonry face of a building.pdf(554.93 KB)
- BSI00000797_BS 5588-5_1991 - Fire precautions in the design, construction and use of buildings— Part 5_ Code of practice for firefighting stairs and lifts.pdf(39.39 MB)
- BSI00000824_BS EN 81-72_2015 (incorporating corrigendum July 2015) - Safety rules for the construction installation of lifts. Particular to passenger and goods passenger lifts. Part 72_ Firefi.pdf(33.34 MB)
- BSI00001721_BS 5588-5_ 1991 - Fire precautions in the design, construction and use of buildings, Part 5_ Code of practice for firefighting stairs and lifts.pdf(29.08 MB)
- BSI00001723_BS 5588-5_ 2004 - Fire precautions in the design, construction and use of buildings. Access and facilities for fire-fighting.pdf(25.56 MB)
- BSI00001725_BS EN 81-72_ 2003 - Safety rules for the construction and installation of lifts. Particular applications for passenger and goods passenger lifts. Firefighters lifts.pdf(15.08 MB)
- BSI00001726_BS EN ISO_IEC 17025_2005 (incorporating corrigendum No. 1) - General requirements for the competence of testing and calibration laboratories_0.pdf(22.55 MB)
- BSI00001729_British Standard Code of Practice CP3_ Chapter IV_ Part 1_ 1971 - Code of basic data for the design of buildings. Precautions against fire. Flats and maisonettes (in blocks over tw.pdf(37.55 MB)
- BSI00001774_BS EN 1775_2007 - Gas supply - Gas pipework for buildings - Maximum operating pressure less than or equal to 5 bar - Functional recommendations.pdf(33.28 MB)
- CEL00002082_Email exchange between Celotex and BRE Global discussing the time schedule re BR 135 Meeting.pdf(1.19 MB)
- CEL00008505_Email between M.Price and Celotex re Enderby Wharf - rainscreen cladding and use of PIR insulation, including comments from NHBC and thermal studies.pdf(1.24 MB)
- CEL00011642_External correspondence between Celotex and Knauf in relation to new products and performing 8414 and RS5000 tests by Knauf.pdf(2.02 MB)
- CEP00053377_BBA Certification- Product Sheet 1- Reynobond Architectural Wall Cladding Panels.pdf(5.09 MB)
- CEP00054338_Correspondence between CEP, Alcoa and Harley regarding Reynobond PE switch from tranparent core to black core also with reference to the Grenfell Tower Project.pdf(902.69 KB)
- CST00001450_Grenfell Tower- Cladding Photograph.pdf(505.16 KB)
- EXO00001938_Warringtonfire BS476-7 test reporton Reynobond 55 FR, report number 157533,.pdf(4.28 MB)
- EXO00001943_Warringtonfire BS476-7 test report on Reynobond 33, report number 157531.pdf(4.34 MB)
- EXO00001951_Warringtonfire BS476-6 test report on Reynobond 33, report number 157536.pdf(3.77 MB)
- EXO00001956_Warringtonfire Class 0 Summary report on Reynobond 33, report numbers 157530 & 157537.pdf(2.34 MB)
- EXO00001958_Warringtonfire Class 0 Summary Report on Reynobond 55 FR, report numbers 157533 & 157534.pdf(2.26 MB)
- EXO00001960_Warringtonfire BS476-6 test report on Reynobond 33, report number 157537.pdf(3.78 MB)
- EXO00001967_Warringtonfire BS476-6 test report on Reynobond 55 FR, report number 157534.pdf(3.72 MB)
- HOM00025737_The Fire Safety (Employee's Capabilities) (England) Regulations 2010.pdf(949.43 KB)
- INQ00011281_CIBSE Guide E Fire safety engineering 2019.pdf(207.25 MB)
- INQ00014126_Article in the Construction Manager magazine entitled _Facing up to fire regs on cladding projects_ by Adrian Pargeter (Kingspan).pdf(6.41 MB)
- INQ00014631_TMO 'TP Tracker' - updated 9 June 2010 - Inquiry team edited to show Grenfell Tower entries only [RBK00057586_FORT04788470].xlsx(26.19 KB)
- JSW00004942_Email from David Hughes (Rydon) to Aftercare (JSW) informing them that the environmental mode on the AOV system is not working on any floor at Grenfell Tower and he requests that t.pdf(422.34 KB)
- KIN00004858_Email correspondence between Arup & Kingspan discussing using K15 on First Street Manchester project; specifically Arup's position that K15 does not meet the Building Regulations,.pdf(1.61 MB)
- KIN00008528_External email exchange between Mostyn Bullock (cc'd Steven Porter and Michael Bell) (Tenos) and Mark Harris_ Adrian Pargeter_ John Garbutt (Kingspan) touching upon the fire safety.pdf(5.59 MB)
- KIN00010874_Email chain between Kingspan, Boon Brown architects and the NHBC concerning justification of K15 when used in buildings over 18m (First Central and Alfa Laval).pdf(8.7 MB)
- KIN00024979_Letter from Kingspan to Brian Martin regarding Adrian Pargeter's oral evidence.pdf(1.88 MB)
- KIN00024980_Letter from Kingspan to Stephen Garvin (Head of Building Standards, The Scottish Government) regarding Adrian Pargeter's oral evidence.pdf(1.88 MB)
- LAK00000242_BSI, BS 7346-8_2013, Components for smoke control systems, Part 8_ code of practice for planning, design, installation, commissioning and maintenance.pdf(27.44 MB)
- LFB00000987_Bi-monthly meeting, LFB Fire Safety Regulation and KCTMO H&S, dated 17_12_2013..pdf(31.09 KB)
- LFB00024106_BS 9991_2011 Fire safety in the design, management and use of residential buildings - Code of practice.pdf(8.62 MB)
- LFB00040607_Operational Directorates Co-Ordination Board Meeting Minutes 02_03_10.pdf(668.05 KB)
- META00001763_Email from Vince Meakins (Alcoa) to Lee Davies (Cap Gropu) attaching visit report.pdf(117.29 KB)
- RBK00002365_Email from Laura Johnson to Lee Chapman re gas pipe concerns.pdf(183.52 KB)
- RBK00020865_Email re Human Assistance Centre List and Layout.pdf(27.09 KB)
- RBK00027247_Email from Ken Swan, DCLG to Laura Johnson, RBKC regarding breach notice final draft.pdf(958.61 KB)
- RBK00060883_RBKC Notebook of Cllr Paget-Brown 16.09.2015 to 29.06.2017.pdf(4.96 MB)
- TMO00879772_Day Book 7 of 8 - Peter Maddison.pdf(25.43 MB)
- TMO00886829_TMO Board Minutes of Meeting on 24.11.2016 (Item 8).pdf(5.49 MB)
- TMO00892994_Agenda item 11Fire Risk Assessments report Feb 2011.docx.pdf(7.59 MB)
- TMO00899852_TMO report entitled _Update on Fire Risk Assessments_ regarding Agenda item 7 fire risk assessments..pdf(1.03 MB)
- TMO10012661_Email enclosing Papers and agenda for Health & Safety Committee Meeting held on 12_04_16.pdf(579.18 KB)
- TMO10037422_®Report to TMO Operations Committee by Janice Wray to Operations Committee on 25 May 2010 regarding a further update on Fire Risk Assessments.pdf(125.74 KB)
- TMO10044133_Fire Risk Assessment for Adair Tower - 11 November 2015.pdf(2.24 MB)