Date: 22 September 2020 > View this hearingWitness: Ben Bailey> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip CEP000000528_Email correspondence between CEP & Harley attaching purchase order for Reynobond ACM cladding_0.pdf(775.67 KB) CEP000007020_Email correspondence between CEP & Harley as to Metal Tech 5-20 Hi Tilt & Turn window system; specifically type 10B windows, requesting factory schedule, indicating window frames.pdf(224.1 KB) HAR00000224_Undated photo of GT showing Cladding _ Window installation_0.pdf(848.59 KB) HAR00002555_Email between Harley and CEP requesting warranties for doors, windows, curtain wall and Reynobond_0.pdf(216.24 KB) HAR00004002_Email from Ben Bailey to Ricky Kay regarding Grenfell tower fire barriers_0.pdf(971.49 KB) HAR00006560_Email Between Ricky Kay, Ben Bailey, Kevin Lamb, Mark Stapley, Sue Sheppard, Neil Crawford, John Hoban (RBKC), Terry Ashton (Exova), Paul Hanson (RBKC), Simon Lawrence, Simon O'Con_0.pdf(3.48 MB) HAR00015299_CEP quotation for Wicona windows, Wincona Curtain Wall and Reynobond cladding_0.pdf(78.14 KB) HAR00017781_Email from Kevin Lamb to Simon Lawrence with details of the firebreaks attached_0.pdf(355.55 KB) HAR00019412_Email chain between Siderise, Harley, RBKC Building, Studio E and Rydon concerning the requirements of cavity barriers and fire stopping and referencing windows with a relevant dra_0.pdf(3.1 MB) HAR00019413_Studio E drawing entitled Proposed Typical Plans, Section & Elevation, Drawing Number 1279 (06) 110, Rev 00_0.pdf(652.31 KB) OSB000000084_Osborne Berry Position Statement dated 27 February 2018_0.pdf(90.94 KB) RBK00027339_Harley Operation and Maintenance Manual for Grenfell tower.pdf(260.45 MB) RYD00018272_Correspondence between Harley and Rydon regarding cladding panels for Grenfell Tower.pdf(465.41 KB) RYD00029689_E-mail discussion re_ delays to GT works and labour levels on site.pdf(2 MB) RYD00037553_Correspondence between Siderise, RBKC, Exova, Harley and Studio E regarding fire barriers_fire stopping to be installed at Grenfell Tower, also attaching Studio E drawing of Typica.pdf(2.34 MB) RYD00040227_Subcontractor progress meeting minutes; attached.pdf(273.04 KB) RYD00074295_Email chain re draft O&M_H&S file and the necessary & reissue the drawings.pdf(775.34 KB) SEA00003436_Studio E, drawing entitled, Detail Section Sheet 1, 1279 (06) 120.pdf(3.02 MB) SIL00000078_Email Ricky Kay to Chris Mort and Sue Sheppard re quotation.pdf(726.71 KB) SIL00000079_Email Sue Sheppard to Ben Bailey attaching amended quotation.pdf(1.47 MB) SIL00000081_Email Ricky Kay of Siderise to Ben Bailey re Grenfell Tower Regeneration Project _ RH25_ RVG.pdf(200.72 KB) SIL00000321_Email from Ricky Kay to Terry Nicolls at Harley entitled _Fire Break _ Lametherm_.pdf(2.94 MB) SIL00000585_Email between Chris Mort (Siderise), Ben Bailey (Harley CW) and Ricky Kay (Siderise) regarding the installation of the vertical firebreaks in Grenfell Tower.pdf(1.07 MB) RYD00038501_Email from Simon O Connor to Ben Bailey re - complaints about staff.pdf(1.19 MB) HAR00009718_SIFG Quote for Celotex RS5000 Insulation.pdf(20.85 KB)