Downloads
- SIL00000295_2018.09.27 - Witness Statement of Barnaby John Carrick (Siderise).pdf(126.18 KB)
- IDX0166_Barnaby John Carrick (Siderise Insulation).pdf(95.11 KB)
- SIL00000025_Emails between Harley and Siderise attaching details of rainscreen cladding with revised cavity barrier requirements, and drawings embedded within email, authored by Harley_1.pdf(4.53 MB)
- SIL00000026_Email between Siderise employees re pricing (follows SIL00000084)_1.pdf(207.08 KB)
- SIL00000027_Email Sue Sheppard responding to email from Ricky Kay at SIL00000026_1.pdf(207.08 KB)
- SIL00000028_Emails between Siderise and SIG Insulation attaching amended quotation for cavity barriers_1.pdf(1.45 MB)
- SIL00000029_Email Ricky Kay to Ben Bailey (Harley) attaching credit account application form_1.pdf(5.87 MB)
- SIL00000030_Emails between Harley and Siderise asking for advice on the fire rating that would be required_1.pdf(429.95 KB)
- SIL00000031_Emails between Harley and Siderise requesting advice on fire rating requirements_1.pdf(416.76 KB)
- SIL00000032_Continuation of conversation between Siderise and Harley re advice on fire rating_1.pdf(194.66 KB)
- SIL00000033_Email Sue Sheppard to Barnaby Carrick re quotation for Grenfell Tower_1.pdf(253.83 KB)
- SIL00000034_Email within Siderise to check proposed response to Harley re firestopping requirements_1.pdf(250.53 KB)
- SIL00000035_Emails within Siderise re clarifying the firestopping requirements (replying to SIL00000034)_1.pdf(211.95 KB)
- SIL00000036_Emails between SIG, Siderise and Harley - chain follows on from SIL00000025 - discussion about cavity barriers and Lamatherm details_1.pdf(511.84 KB)
- SIL00000037_Emails within Siderise re drafted response on firestopping requirements (thread from SIL00000034)_1.pdf(215.85 KB)
- SIL00000038_Email Christ Mort to Kevin Lamb (Harley) (thread from SIL00000034), embedded with Siderise, drawing entitled Compartmentation, SW3537 Rev A_1.pdf(1.68 MB)
- SIL00000039_Emails within Siderise re firestopping requirements (thread from SIL00000034)_1.pdf(208.13 KB)
- SIL00000040_Email Sue Sheppard to Gill Walker requesting update on Grenfell Tower_1.pdf(255.97 KB)
- SIL00000041_Email Gill Walker replying to Sue Sheppard email at SIL00000040_1.pdf(193.16 KB)
- SIL00000042_Email Sue Sheppard to Gill Walker replying to SIL00000041_1.pdf(180.51 KB)
- SIL00000043_Email within Siderise attaching cavity barrier quotation for Grenfell Tower_1.pdf(1.55 MB)
- SIL00000044_Email re SIG quote for Grenfell Tower_1.pdf(321 KB)
- SIL00000045_Email re SIG quote_1.pdf(284.37 KB)
- SIL00000046_Email re receipt of credit application from Harley (following SIL00000045)_1.pdf(229.56 KB)
- SIL00000047_Emails between Siderise and SIG Insulation re request for Siderise prices (reply to SIL00000036)_1.pdf(234.05 KB)
- SIL00000048_Email from Harley Curtain Wall re finances for Grenfell Tower Regeneration Project_1.pdf(306.49 KB)
- SIL00000049_Email Sue Sheppard to Nick Mayer responding to SIL00000048_1.pdf(216.54 KB)
- SIL00000050_Email Sue Sheppard to Mark Stapley re credit limit for Harley_1.pdf(325.7 KB)
- SIL00000051_Email Ricky Kay to Sue Sheppard re quotation_1.pdf(210.35 KB)
- SIL00000052_Email Sue Sheppard of Siderise responding to Ricky Kay re Grenfell Tower Regeneration Project_1.pdf(192.05 KB)
- SIL00000053_Email within Siderise re quotation for Harley discussing product in development, responding to SIL00000051_1.pdf(228.69 KB)
- SIL00000054_Emails within Siderise requesting new drawing for revised fire rating_1.pdf(260.62 KB)
- SIL00000055_Emails within Siderise re quotation for Grenfell Tower_1.pdf(216.53 KB)
- SIL00000056_Emails within Siderise re change in proposed fire rating, responding to SIL00000055_1.pdf(208.78 KB)
- SIL00000057_Email Sue Sheppard to Barnaby Carrick responding to SIL00000056_1.pdf(194.25 KB)
- SIL00000058_Email Sue Sheppard to Barnaby Carrick_1.pdf(216.98 KB)
- SIL00000059_Email from Siderise to Harley attaching revised quotation following revised cavity barrier_1.pdf(1.54 MB)
- SIL00000060_Emails from Siderise to Harley attaching quotation_1.pdf(555.98 KB)
- SIL00000061_Email Kevin Lamb to Sue Sheppard_Kathryn Evans requesting literature for vertical fire breaks and embedding drawings authored by Harley_1.pdf(4.08 MB)
- SIL00000062_Email Siderise to Harley re reversion to 30 minute fire rating_1.pdf(204.14 KB)
- SIL00000063_Emails from Siderise to Harley re ordering 30m fire barrier_1.pdf(281.27 KB)
- SIL00000064_Email Harley to Siderise requesting Building Regs to support advice that 30_15 firebreaks are required_1.pdf(376.48 KB)
- SIL00000065_Email from Siderise to Harley attaching extract from AD B and explaining reasoning for interpretation on firestop requirements_1.pdf(998.69 KB)
- SIL00000066_Email Siderise to Harley requesting confirmation to proceed with 30 min firebreaks_1.pdf(223.1 KB)
- SIL00000067_Email chain between Siderise, Harley and RBKC Building Control discussing building control fire safety requirements for the cladding._1.pdf(1.67 MB)
- SIL00000068_Emails between RBKC Building Control, Harley, Studio E, Rydon and Exova, then forwarded to Siderise, showing BC interpretation of ABD requirements re fire stopping_1.pdf(327.08 KB)
- SIL00000069_Emails between Siderise and Harley commenting on product details supplied (reply to SIL00000025)_1.pdf(712.5 KB)
- SIL00000070_Email from Siderise to Rydon, Harley and Exova re drawing with build up of cladding, in response to RBKC BC email_1.pdf(271.47 KB)
- SIL00000071_Email Ben Bailey to Ricky Kay attaching details - section through system and location of fire breaks_1.pdf(2.64 MB)
- SIL00000072_Email Simon Lawrence to various, arising out of Ricky Kay email at SIL00000070_1.pdf(351.99 KB)
- SIL00000073_Email Chris Mort responding to SIL00000072_1.pdf(273.47 KB)
- SIL00000074_Email Simon Lawrence responding to SIL00000073_1.pdf(290.68 KB)